The process for reviewing documentation PRs is slightly different from the general process for reviewing code PRs. This document explains the differences.
The Documentation Team is responsible for carrying out a full documentation review of a PRs containing documentation changes. Such a review includes checking the grammar, structure, consistency, and typographical correctness of the documentation changes.
The following GitHub team lists the users who are members of the Documentation Team:
Project maintainers have the power to approve or reject PRs.
If a Documentation Team review is required, the CODEOWNERS
configuration will
apply and the PR will be blocked until the required number of acks are
obtained for the documentation changes.
Technical writers from the Documentation Team will review the document
changes and add comments explaining how the wording should be changed. It is
then up to the PR creator to apply these changes to their original PR,
rebasing as necessary to ensure a clean git(1)
history. Once the creator has
applied the changes they need to re-push their branch and add a comment to the
PR asking for a re-review. This process continues indefinitely until the the
Documentation Team is happy with the final result.
The documentation review process is different than the code review process for the following reasons:
Just like code changes, some documentation changes have to be merged as soon as possible to ensure users have current and accurate information.
Documentation changes tend to be more urgent though. For example, a "Priority 1" code issue needs to be fixed quickly. However it would also need to be documented clearly (and quickly). If the P1 issue cannot be fixed quickly, the documentation must still be updated as soon as possible to alert users of the issue and to provide suitable workarounds.
If the documentation is not kept current, users have incorrect information and might create problems for themselves or become disaffected with the project entirely.
In summary, do not let documentation PRs sit in the PR backlog for any longer than necessary.
If a PR makes a minor change to one or more documents, passing to the Documentation Team for a formal review and approval might not be necessary.
Since a full document review can be a slow and pain-staking process, and since the number of professional technical writers on the Documentation Team is relatively small compared to the number of developers, it makes sense to only perform such reviews on the documents that justify the effort.
If a Documentation Team member believes a full review is required, their decision is final.
In most other cases, a project maintainer will decide whether a full review is required or not.
If project maintainers cannot decide whether the lightweight process should be followed, the full process should be used instead since the uncertainty implies "more eyes" should see the changes.
If a PR contains documentation changes that only relate to one or more of the following categories, it does not need to be formally reviewed and approved by the Documentation Team:
-
Changes to code blocks
The PR only modifies code blocks embedded in the document.
-
"Typo" fixes
The PR only fixes spelling mistakes and whitespace issues.
-
Formatting
The PR only modifies the layout of the existing text. For example, you update words to render them in a
fixed font
or change a Note to fit the standard formatting conventions. -
URL fixes
The PR only modifies URLs or updates the table of contents.
-
The PR only removes documentation.
The following PR changes generally indicate a full document review is necessary:
-
A new document has been added by the PR.
All documents should have an initial review unless they are extremely simple.
If a PR needs a full document review, add a comment to the PR like the following, which sends a mail to all members of the Documentation Team:
PTAL @kata-containers/documentation
-
Obtain general agreement that a Document Team review is not required.
-
Ensure all other approvals and CI checks have been met.
-
Ensure the PR contains a note explaining why the PR does not justify a full review.
-
Request a project maintainer force-merges the PR.
This operation bypasses the check that normally stops a PR from landing until the Documentation Team acks the PR.
-
The maintainer should notify the Documentation Team out of courtesy that the PR has been merged.
This allows a follow-on "recovery PR" to be raised should the Documentation Team disagree on using the lightweight process.