Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

iCubErzelli02 S/N:036 – Full overhaul of the robot #1638

Closed
16 tasks done
sgiraz opened this issue Sep 11, 2023 · 2 comments
Closed
16 tasks done

iCubErzelli02 S/N:036 – Full overhaul of the robot #1638

sgiraz opened this issue Sep 11, 2023 · 2 comments

Comments

@sgiraz
Copy link
Contributor

sgiraz commented Sep 11, 2023

Robot Name 🤖

iCubErzelli02 S/N:036

Request/Failure description

As per #1570 (comment), we are required to do a full overhaul of the robot before delivering it back to Erzelli.

Note
This activity has been planned and managed internally.

Detailed context

In order to perform the whole overhaul of the robot we have to perform the following tasks:

  • Check the following tendons: shoulders, fingers, waist, and forearms
  • Check for faulted or locked the motors
  • Check for faulted boards
  • Check for faulted wires (CAN, ETH, SPI encoders)
  • Check for termination on mais boards and wherever they are needed
  • Check for broken supports and covers
  • Check for loosening and missing screws
  • Check for possible shortcircuits (notified shutdowns here and here)

Additional context

Possible imporvements:

  • Remove from the configuration files the following (unused) joints:
    • Whole lower body
    • Skin all over the robot

Robot tests + SW updates

  • Update robotology-superbuild
  • Update FW of all the boards
  • Yarprobotinterface starts without errors
  • Every single joint is movable correctly both by hand and by Yarpmotorgui
  • Face expressions work
  • Cameras work

How does it affect you?

No response

@github-actions github-actions bot changed the title Full overhaul of the robot iCubErzelli02 S/N:036 – Full overhaul of the robot Sep 11, 2023
@AntonioConsilvio
Copy link
Contributor

This is the PR for the configurations files (the robot is already up to date):

The robot has been packed and it is ready for shipment:

Shipment1
Shipment2

cc @maggia80 @Fabrizio69 @sgiraz @ddetommaso @andreaderito @Andreamenini68

@sgiraz
Copy link
Contributor Author

sgiraz commented Sep 12, 2023

@sgiraz sgiraz closed this as completed Sep 12, 2023
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Projects
Status: Done
Development

No branches or pull requests

2 participants