-
Notifications
You must be signed in to change notification settings - Fork 0
/
index.html
4728 lines (4727 loc) · 741 KB
/
index.html
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN"
"http://www.w3.org/TR/1998/REC-html40-19980424/loose.dtd">
<html>
<head><meta http-equiv="content-type" content="text/html; charset=UTF-8"><meta name="generator" content="ABBYY FineReader PDF 15"><meta name="author" content="huihui">
<style type="text/css">
table.main {}
tr.row {}
td.cell {}
div.block {}
div.paragraph {}
.font0 { font:4pt Arial, sans-serif; }
.font1 { font:5pt Arial, sans-serif; }
.font2 { font:6pt Arial, sans-serif; }
.font3 { font:7pt Arial, sans-serif; }
.font4 { font:8pt Arial, sans-serif; }
.font5 { font:9pt Arial, sans-serif; }
.font6 { font:10pt Arial, sans-serif; }
.font7 { font:11pt Arial, sans-serif; }
.font8 { font:12pt Arial, sans-serif; }
.font9 { font:18pt Arial, sans-serif; }
.font10 { font:30pt Arial, sans-serif; }
.font11 { font:38pt Arial, sans-serif; }
.font12 { font:6pt Book Antiqua, serif; }
.font13 { font:7pt Book Antiqua, serif; }
.font14 { font:8pt Book Antiqua, serif; }
.font15 { font:9pt Book Antiqua, serif; }
.font16 { font:10pt Book Antiqua, serif; }
.font17 { font:17pt Book Antiqua, serif; }
.font18 { font:31pt Book Antiqua, serif; }
.font19 { font:8pt Cambria, serif; }
.font20 { font:9pt Cambria, serif; }
.font21 { font:11pt Cambria, serif; }
.font22 { font:14pt Cambria, serif; }
.font23 { font:15pt Cambria, serif; }
.font24 { font:6pt Courier New, monospace; }
.font25 { font:9pt Courier New, monospace; }
.font26 { font:14pt Courier New, monospace; }
.font27 { font:6pt SimHei, sans-serif; }
.font28 { font:7pt SimHei, sans-serif; }
.font29 { font:8pt SimHei, sans-serif; }
.font30 { font:9pt SimHei, sans-serif; }
.font31 { font:10pt SimHei, sans-serif; }
.font32 { font:12pt SimHei, sans-serif; }
.font33 { font:14pt SimHei, sans-serif; }
.font34 { font:15pt SimHei, sans-serif; }
.font35 { font:17pt SimHei, sans-serif; }
.font36 { font:5pt SimSun, serif; }
.font37 { font:6pt SimSun, serif; }
.font38 { font:7pt SimSun, serif; }
.font39 { font:8pt SimSun, serif; }
.font40 { font:9pt SimSun, serif; }
.font41 { font:10pt SimSun, serif; }
.font42 { font:11pt SimSun, serif; }
.font43 { font:12pt SimSun, serif; }
.font44 { font:13pt SimSun, serif; }
.font45 { font:20pt SimSun, serif; }
.font46 { font:21pt SimSun, serif; }
.font47 { font:31pt SimSun, serif; }
.font48 { font:32pt SimSun, serif; }
.font49 { font:36pt SimSun, serif; }
.font50 { font:8pt Tahoma, sans-serif; }
.font51 { font:4pt Times New Roman, serif; }
.font52 { font:5pt Times New Roman, serif; }
.font53 { font:6pt Times New Roman, serif; }
.font54 { font:7pt Times New Roman, serif; }
.font55 { font:8pt Times New Roman, serif; }
.font56 { font:9pt Times New Roman, serif; }
.font57 { font:10pt Times New Roman, serif; }
.font58 { font:11pt Times New Roman, serif; }
.font59 { font:12pt Times New Roman, serif; }
</style>
</head>
<body>
<p><a name="bookmark0"></a><span class="font55">This article has been accepted for inclusion in a future issue of this journal. Content is final as presented, with the exception of pagination.</span></p>
<p><span class="font2" style="text-decoration:underline;">INVITED</span></p>
<p><span class="font2">PAPER</span></p>
<p><span class="font18" style="font-weight:bold;">Offshore Wind Power</span></p>
<p><span class="font18" style="font-weight:bold;">Generation Technologies</span></p>
<p><span class="font56">By </span><span class="font57" style="font-variant:small-caps;">Istvan Erlich, </span><span class="font56" style="font-style:italic;">Senior Member IEEE</span><span class="font57" style="font-style:italic;">, </span><span class="font57" style="font-variant:small-caps;">Fekadu Shewarega, </span><span class="font56" style="font-style:italic;">Member IEEE</span><span class="font56">, </span><span class="font57" style="font-variant:small-caps;">Christian Feltes, </span><span class="font56" style="font-style:italic;">Student Member IEEE</span><span class="font57" style="font-style:italic;">, </span><span class="font57" style="font-variant:small-caps;">Friedrich W. Koch, and Jens Fortmann, </span><span class="font56" style="font-style:italic;">Member IEEE</span></p>
<p><span class="font3" style="font-weight:bold;">ABSTRACT </span><span class="font7">| </span><span class="font4">This paper provides an overview of the current state of the technology of offshore wind-based power generation and the technological challenges with emphasis on the electrical parts. First, a brief review of the core control functions, their correlation with operational behavior, and the gridsupporting capability of the machine during normal operation as well as during contingency situations are provided. This is followed by the discussion of basic considerations in wind farm collector design, including topology, grounding options, and outlay of the offshore substation. Then, issues related to offshore turbine foundation and typical dimensions of the offshore substation platform are discussed. The platform is designed to accommodate the main and grounding transformers, the switch gear, and other assorted accessories. Next, options for the transmission link from the offshore plant to the grid onshore are reviewed. Finally, a discussion of issues related to grid integration together with currently applicable special grid code requirements concludes the paper.</span></p>
<p><span class="font3" style="font-weight:bold;">KEYWORDS </span><span class="font7">| </span><span class="font4">Collector grid; fault ride through; grid codes; offshore wind power; platform; voltage support; wind generator</span></p>
<p><span class="font2">Manuscript received January 26, 2012</span><span class="font38">;</span><span class="font2"> revised September 10, 2012</span><span class="font38">;</span><span class="font2"> accepted October 2, 2012.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font2" style="font-weight:bold;">I. Erlich </span><span class="font2">and </span><span class="font2" style="font-weight:bold;">F. Shewarega </span><span class="font2">are with the University Duisburg Essen, 47057 Duisburg, Germany (e-mail:</span><a href="mailto:[email protected]"><span class="font2"> [email protected]</span></a><span class="font38">;</span><span class="font2"> </span><a href="mailto:[email protected]"><span class="font2">[email protected]</span></a><span class="font2">).</span></p></li></ul>
<p><span class="font2" style="font-weight:bold;">C. Feltes </span><span class="font2">and </span><span class="font2" style="font-weight:bold;">F. W. Koch </span><span class="font2">are with RWE Innogy, 22297 Hamburg, Germany (e-mail: </span><a href="mailto:[email protected]"><span class="font2">[email protected]</span></a><span class="font38">;</span><span class="font2"> </span><a href="mailto:[email protected]"><span class="font2">[email protected]</span></a><span class="font2">).</span></p>
<ul style="list-style:none;"><li>
<p><span class="font2" style="font-weight:bold;">J. Fortmann </span><span class="font2">is with REpower Systems AG, 22768 Rendsburg, Germany (e-mail: </span><a href="mailto:[email protected]"><span class="font2">[email protected]</span></a><span class="font2">).</span></p></li></ul>
<p><span class="font36">Digital Object Identifier: 10.1109/JPROC.2012.2225591</span></p><img src="活页夹1_files/3b75391-1.jpg" alt="" style="width:181pt;height:92pt;">
<p><span class="font4" style="font-weight:bold;">Fig. 1. </span><span class="font3" style="font-weight:bold;font-style:italic;">Evolution ofthe installed wind generation capacity in Germany.</span></p>
<p><span class="font16" style="font-weight:bold;">I. INTRODUCTION</span></p>
<p><span class="font15">The rapid increase in installed wind generation capacity witnessed in the recent past has continued worldwide with undiminished vigor. This development is set to continue well into the future. By the end of 2010, the aggregate installed wind-based power generation in Germany reached 27 214 MW, and is projected to cross the 50-GW mark by 2020 [1]. Fig. 1 shows the progression of installed capacity over the last two decades.</span></p>
<p><span class="font15">Another remarkable development to be observed starting from the mid-1990s is the increasing interest to locate wind turbines in the high seas. Offshore wind resources are vast. The wind energy potential in the seas of the European Union with water depths of up to 50 m, for example, is easily several times larger than the total European electricity consumption. Consequently, in addition to the current large number of onshore sites, many offshore sites are in the planning or implementation stages. Offshore wind farm capacity in the North Sea and the Baltic Sea (off the northern coast of Europe) alone is expected to rise to 20-25 GW by 2030 [1].</span></p>
<p><span class="font50">Shewarega </span><span class="font50" style="font-style:italic;">et al.</span><span class="font41" style="font-style:italic;">:</span><span class="font50"> Offshore Wind Power Generation Technologies</span></p><img src="活页夹1_files/3b75391-2.jpg" alt="" style="width:203pt;height:101pt;">
<p><span class="font1" style="font-weight:bold;">2001 2202 2003 2004 2005 2006 2007 2008 2009 2010 2011</span></p>
<p><span class="font4" style="font-weight:bold;">Fig. 2. </span><span class="font3" style="font-weight:bold;font-style:italic;">Installed offshore wind power in the European Union.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font15">Fig. 2 shows the evolution of offshore wind power capacity along the shores of countries in the European Union over the last decade. In the first six months of 2011, in total 101 new turbines with the overall capacity of 348.1 MW became operational, an increase of 4.5% compared to the same period last year [2]. In all, 11 sites were under construction during this period, with a total installed capacity of 2844 MW when completed.</span></p></li></ul>
<p><span class="font15">Compared to the remarkably fast increase of onshore installations in the previous decade, these developments in terms of volume seem to be insignificant. But they are to be understood mostly as trial-balloon-type installations intended to gain insight into the operational challenges, and a significant increase in offshore capacity is already in the works. In Europe alone some 150 GW of offshore projects are already in various stages of planning [2]. According to [3], 25 offshore wind parks have already been approved outside the 12-nmi zone in the German areas of the North Sea and the Baltic Sea, and planning permission for further 50 projects has been applied for as of 2011. Other European countries also have firm plans for or have already started construction of offshore wind parks. Accordingly, offshore wind parks hold a huge promise for growth in the years ahead.</span></p>
<p><span class="font15">The basic technology and control concepts for a wind turbine are the same whether the turbine and its components are designed for offshore or onshore installation. The same applies to the overall process of layout design, which in both cases evaluates and compares configuration options in relation to the technical feasibility, overall capital cost, and the estimated energy production. However, the optimization parameters in offshore layout design, planning of the installation, and operational priorities vary significantly from those for onshore sites. For example, acoustic emissions which constitute an important consideration in onshore wind farm design are less relevant for the design of offshore projects. As a result, the turbine can be designed for higher tip speed ratio, thus enabling smaller turbine weight for the same energy output. On the other hand, offshore design places more emphasis on reliability since any necessary maintenance work is time consuming and constitutes a complex logistical operation involving the deployment of purpose-built ships and mobile gear. The vagaries of the high seas setting, which the components are exposed to, together with the operational objective of reduced maintenance requirement call for more robust material and equipment design and redundancy concepts compared to those used for conventional applications.</span></p>
<p><span class="font15">The evolution of offshore wind farm technology has come a long way from its early days in the 1990s. The turbines grew larger and are now capable of producing more energy per unit area. The costs of foundation and electrical infrastructure as well as the overall operational expenses have all decreased significantly. With the steadily maturing technology and the priority status accorded to renewable energy still remaining in place, there is a significant growth potential for offshore wind farms in the years ahead.</span></p>
<p><span class="font15">This paper intends to provide an overview of the overall technological challenges related to offshore wind-based power generation and the current state of the technology with emphasis on the electrical system and the associated control systems. The specific issues to be addressed include wind turbine technology with detailed overview of operational and control issues, wind farm collector grid design considerations, and finally issues related to grid integration together with currently applicable special grid code requirements.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font16" style="font-weight:bold;">II. WIND TURBINE GENERATORS</span></p></li></ul>
<p><span class="font15">The generators employed in wind power plants are conceptually the same synchronous or asynchronous machines used for various other applications. As the generator is mounted at the top of the tower, the weight of a wind generator has much more significance than machines to be used for other applications. As a result, lower speed rating is desired so that the gear transmission ratio and thus the weight of the gearbox are as small as possible. It is also for the same reason that permanent magnet machines are continuously making headway in the share of the market. But with the cost of the raw material (rare earths) rising, it is not clear in which direction the development will evolve in the years ahead. Apart from these requirements pertaining to dimensions of the machine, what is new in modern megawatt range wind turbine generator systems is the application of frequency converters. Accordingly, the defining feature of wind-based generation plants is the arrangement of the converters used in conjunction with the machines and in case of offshore wind farms the location itself and the connection to shore.</span></p>
<p><span class="font15">The two most popular alternatives used for megawatt range turbines are the doubly-fed induction machine (DFIM) in which the stator terminals are directly connected to the network while a back-to-back frequency converter provides the controllable voltage to be fed to the rotor terminals, and a full-size converter machine (FSCM) in which a synchronous or squirrel-cage induction</span></p>
<p><span class="font50">Shewarega </span><span class="font50" style="font-style:italic;">et al.</span><span class="font41">:</span><span class="font50"> Offshore Wind Power Generation Technologies</span></p><img src="活页夹1_files/3b75391-3.png" alt="" style="width:229pt;height:204pt;">
<p><span class="font4" style="font-weight:bold;">Fig. 3. </span><span class="font3" style="font-weight:bold;font-style:italic;">DFIM-based wind turbine with control variables.</span></p>
<p><span class="font15">machine is connected to the gird via a converter designed for the full turbine rating.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font15" style="font-weight:bold;">A. The Doubly Fed Induction Machine (DFIM)</span></p></li></ul>
<p><span class="font15">The DFIM is still the most commonly encountered machine in modern large turbines, although this may change in the future. A typical layout of a DFIM system including the measured values for control and protection is shown in Fig. 3.</span></p>
<p><span class="font15">Since the back-to-back converter is connected to the rotor circuit, obviously it has to be rated only for the maximum rotor power, which in turn depends on the desired speed range (about </span><span class="font16">±</span><span class="font15">30% around the synchronous speed). The so-called rotor crowbar is used to protect the machine side converter (MSC) against over-currents during abnormal system conditions. When a contingency situation causes crowbar switching, the rotor terminals are short-circuited through the crowbar resistors. The MSC itself remains blocked for the duration of crowbar activation. The flipside of this protective measure is that it causes the machine to resort to an ordinary singly-fed induction machine and thus to become uncontrollable. On the other hand, transmission system operators impose certain performance requirements (grid codes) on the wind turbine vis-a-vis their performance in grid operation both during and in the aftermath of the fault. Depending on the stringency of the applicable requirements, even a short-term loss of controllability can make fulfillment of these stipulations impossible [4]. To forestall crowbar ignition (and, thus, retain machine controllability for most fault scenarios), the current trend is to insert a chopper in parallel to the direct current (dc) capacitor, leaving the crowbar only as a backup protection. When the dc voltage exceeds a preset value, the chopper switches a resistor (in parallel to the capacitor) to limit the dc voltage thereby preempting the need for crowbar activation. A similar operational behavior can be achieved by using active crowbars in which</span><span class="font33">—</span><span class="font15">as opposed to thyristors used in ordinary crowbars——insulated gate bipolar transistor (IGBT) switches are used.</span></p>
<p><span class="font15">In multimegawatt machines, the wind turbine-generator system is typically connected to the grid via a three-winding transformer. The line side converter (LSC) is connected to the low-voltage side (< 1000 V) of the transformer, while the terminal connected to the stator of the machine can have voltage values of up to 6 kV. The arrangement (i.e., the use of lower voltage) reduces the cost of semiconductor devices/converters used.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font15" style="font-weight:bold;">B. Full-Size Converter Machine (FSCM)</span></p></li></ul>
<p><span class="font15">The salient feature of the FSCM is that it is connected to the grid through a converter with the full machine rating. The generator to be used with the full-size converter can be of a squirrel-cage induction machine (SCIG) type or a synchronous machine. In case of the synchronous machine, there is the option of electrical or permanent magnet excitation. If the electrically excited synchronous machine is used, the MSC can be replaced by a more economical passive rectifier and the generator is controlled through a dc/dc converter providing the rotor excitation and another dc/dc converter in the dc circuit (between the back-to-back converters) [5]. In case of the permanent magnet synchronous generator (PMSG) and SCIG, the MSC is a fully controllable converter based on selfcommutated semiconductor devices.</span></p>
<p><span class="font15">FSCM-based wind turbines (WTs) contain a braking chopper in the dc circuit (similar to the DFIM) to dissipate the generated power during grid faults. The series inductor and the filter are required for harmonic suppression and power quality improvement.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font16" style="font-weight:bold;">III. WIND TURBINE CONTROL</span></p></li></ul>
<p><span class="font15">The two core control functions in a wind turbine are the pitch-angle and converter controls [7]-[13]. A combination of the two enables variable speed operation over a wide range of wind speeds, which is essential for the efficiency of the aerodynamic energy conversion process in wind turbines (see Fig. 4). Additionally, the control and protection functions of the converter ultimately determine the operational behavior of the wind turbine in grid operation, not least its grid supporting capabilities during contingency situations.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font15" style="font-weight:bold;">A. Overview</span></p></li></ul>
<p><span class="font15">Fig. 5 summarizes the major control tasks in a wind turbine/farm together with the inter-linkages between them. The nomenclatures of the variables used in the figure (respectively) are as follows: </span><span class="font15" style="font-style:italic;">v<sub>t</sub></span><span class="font31">; </span><span class="font15" style="font-style:italic;">v<sub>G</sub></span><span class="font31">; </span><span class="font15">v<sub>Gr</sub></span><span class="font31">; </span><span class="font15">and v</span><span class="font13"><sub>re</sub>f </span><span class="font15">are the turbine terminal, the turbine reference, the grid, and grid reference voltages, respectively; p</span><span class="font31">; </span><span class="font15">p</span><span class="font13">i<sub>im</sub></span><span class="font31">; </span><span class="font15">p</span><span class="font13">Glim</span><span class="font31">; </span><span class="font15">and </span><span class="font15" style="font-style:italic;">p<sub>e</sub></span></p>
<p><span class="font50">Shewarega </span><span class="font50" style="font-style:italic;">et al.</span><span class="font41">:</span><span class="font50"> Offshore Wind Power Generation Technologies</span></p>
<div><img src="活页夹1_files/3b75391-4.png" alt="" style="width:301pt;height:204pt;">
<p><span class="font4" style="font-weight:bold;">Fig. 4. </span><span class="font3" style="font-weight:bold;font-style:italic;">Full size converter-based wind turbine with control variables.</span></p>
</div><br clear="all">
<p><span class="font15">are the turbine output power, the turbine power limit, the grid power limit, and the air-gap electrical power, respectively; q</span><span class="font31">; </span><span class="font15">q</span><span class="font13"><sub>re</sub>f </span><span class="font31">; </span><span class="font15">and </span><span class="font15" style="font-style:italic;">q<sub>Gr</sub></span><span class="font15"> are the machine output, the turbine reference, and the grid reference reactive power, respectively; </span><span class="font15" style="font-style:italic;">i</span><span class="font12" style="font-style:italic;">G</span><span class="font31"> ; </span><span class="font15" style="font-style:italic;">i<sub>Rr</sub></span><span class="font31">; </span><span class="font15">and </span><span class="font15" style="font-style:italic;">i<sub>Ri</sub></span><span class="font15"> are the grid current, the prescribed current (real part), and the prescribed current (imaginary part), respectively; V</span><span class="font12">W</span><span class="font31">; </span><span class="font15" style="font-style:italic;">n</span><span class="font12" style="font-style:italic;">G</span><span class="font31">; </span><span class="font15">n</span><span class="font13"><sub>re</sub>f</span><span class="font31">; </span><span class="font15">and </span><span class="font15" style="font-style:italic;">8</span><span class="font15"> are the wind speed, the generator speed, the reference rotational speed, and the pitch angle, respectively.</span></p>
<p><span class="font15">The core control functions are contained in the block ‘‘turbine control,,, which receives the reactive power setpoint (or, alternatively, the voltage set-point) from the operational control of the wind turbine or wind farm in line with the requirements of the system. The aerodynamic, the drive train, the generator, and converter blocks represent the mathematical models, which usually are put together in the form of a system of equations. The turbine control and pitch control blocks are the subject of detailed discussion in the following sections.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font15" style="font-weight:bold;">B. Pitch-Angle Control and Tracking Characteristic</span></p></li></ul>
<p><span class="font15">The objective of the pitch-angle control is to limit the output power of the wind turbine and speed to a specified maximum value, when the wind speed increases beyond the design value by pitching the turbine blades out of the wind. This action reduces the mechanical stress on the wind turbine and the drive train.</span></p>
<p><span class="font15">A wind turbine can extract the maximum possible power corresponding to a given wind speed (within the allowable operational range) only if it runs at a specific speed. This performance requirement is met by controlling the electromechanical generator torque across a wide range of wind speeds in such a way that the operating points approximately match the tracking characteristic of the turbine, i.e., the rotor speed corresponding to the maximum power for each of the wind speeds in Fig. 6.</span></p>
<div><img src="活页夹1_files/3b75391-5.png" alt="" style="width:226pt;height:126pt;">
<p><span class="font4" style="font-weight:bold;">Fig. 5. </span><span class="font3" style="font-weight:bold;font-style:italic;">Outline of the overall wind turbine control structure.</span></p>
</div><br clear="all">
<div><img src="活页夹1_files/3b75391-6.jpg" alt="" style="width:228pt;height:156pt;">
<p><span class="font4" style="font-weight:bold;">Fig. 6. </span><span class="font3" style="font-weight:bold;font-style:italic;">Tracking characteristic of a DFIM-based WT.</span></p>
</div><br clear="all">
<p><span class="font50">Shewarega </span><span class="font50" style="font-style:italic;">et al.</span><span class="font41" style="font-style:italic;">:</span><span class="font50"> Offshore Wind Power Generation Technologies</span></p>
<p><span class="font15">However, as can be observed in the figure, the practical generator speed control range is rather limited. For example, for multimegawatt wind turbines the range is from the power corresponding to the cut-in wind speed up to approximately 40% of the rated power.</span></p>
<p><span class="font15">With further increasing wind speed, the generator speed is maintained constant at its nominal value and the power is allowed to increase up to the nominal value. The margin between nominal and cutout wind speed is chosen large enough to avoid generator overspeed tripping due to strong wind gusts or in case of a grid fault. To limit the dynamic overshoot of the rotor speed, the torque is maintained constant above the nominal generator speed, leading to increased electrical power, which counteracts the mechanical acceleration of the turbine due to higher wind speed.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font15" style="font-weight:bold;">C. Converter Control</span></p></li></ul>
<p><span class="font15">The frequency converter allows the control of active and reactive power independent of one another. While the reactive power control is dictated by the need to maintain acceptable voltage profile in the system, active power is determined by the primary source of energy——the wind speed. Variable speed operation of the wind turbine over a broad range of wind speeds is required so that the wind turbine extracts the maximum power from the wind. Accurate measurement of wind speed in the vicinity of the nacelle is difficult due to turbulence. As a result, measured power is used to determine the speed set-point using a lookup table in which the tracking characteristic of the turbine is stored.</span></p>
<p><span class="font15">The MSC and LSC controls in both the DFIM and the FCSM have distinct control tasks, which makes separate consideration of the two necessary.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font15" style="font-style:italic;">1) MSC Control:</span><span class="font15"> Common to both the DFIM and the FSCM is the fact that the turbine speed control is responsible for regulating the turbine speed for maximum power generation in accordance with the tracking characteristic in part load mode (via the converter control) and limiting the power to the rated value during periods of high wind speed (via the pitch-angle control). Additionally, the reactive power output (or, alternatively, the power factor or voltage) is controlled in line with system requirements. In the DFIM, the outputs of the real and reactive power controllers are the rotor current set-points, which in turn are inputs to the underlying current controllers. The current controller then determines the rotor voltage to be generated by the MSC so that the control objectives are achieved. In the FSCM, the stator current set-points are generated by the power controller, which in turn adjusts the stator voltage.</span></p></li>
<li>
<p><span class="font15" style="font-style:italic;">2) LSC Control:</span><span class="font15"> The task of the LSC controller is to maintain the dc link voltage at the prescribed value and to support the grid with reactive current injection during grid faults and also in steady state if and when the need arises. In a rotating reference frame, in which the direct axis is aligned to the positive sequence terminal voltage, the direct </span><span class="font16">(</span><span class="font15">d</span><span class="font16">) </span><span class="font15">axis current corresponds to the active current, and the quadrature </span><span class="font15" style="font-style:italic;">(q)</span><span class="font15"> axis current corresponds to the reactive current. It can be shown in some simple steps that the d-axis current can be used to control the dc voltage and the </span><span class="font15" style="font-style:italic;">q</span><span class="font15">-axis current can be used to control the reactive power independently of one another. The output of the dc voltage controller and the reactive current corresponding to the reactive power reference serve as reference values for the underlying current controller.</span></p></li></ul>
<p><span class="font15">In the FSCM, the reactive power has to be provided in full by the LSC, whereas the DFIM offers the option of using both the LSC and the MSC to provide the reactive power during fault and also in steady state.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font16" style="font-weight:bold;">IV. ELEMENTS OF THE COLLECTOR SYSTEM</span></p></li></ul>
<p><span class="font15">An offshore wind park, depending on its size, may contain a large number of turbines spread over an area of tens of square kilometers. Each turbine-generator set is directly connected to a step-up transformer, which is referred to as a turbine transformer. This transformer according to the current practice is connected Dyn (or Dynyn for the DFIM). Medium - voltage sea cables then link the turbine formations to the offshore substation. The platform additionally accommodates the compensation reactor, the standby diesel generator set, and the grounding transformer (see Figs. 7 and 8). In the following paragraphs, these components will be reviewed briefly.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font15" style="font-weight:bold;">A. A Standby Diesel Generator Set</span></p></li></ul>
<p><span class="font15">Contingency situations can cause loss of connection to the grid onshore and force the offshore system into an island operation. Due to possible rough weather conditions, access to the site may be difficult and electricity supply interruptions for prolonged periods are possible. As</span></p><img src="活页夹1_files/3b75391-7.jpg" alt="" style="width:217pt;height:144pt;">
<p><span class="font4" style="font-weight:bold;">Fig. 7. </span><span class="font3" style="font-weight:bold;font-style:italic;">Offshore substation platform Baltic 1.</span></p>
<p><span class="font50">Shewarega </span><span class="font50" style="font-style:italic;">et al.</span><span class="font41" style="font-style:italic;">:</span><span class="font50"> Offshore Wind Power Generation Technologies</span></p>
<div style="border-bottom:solid;"><img src="活页夹1_files/3b75391-8.jpg" alt="" style="width:217pt;height:174pt;">
<p><span class="font4" style="font-weight:bold;">Fig. 8. </span><span class="font3" style="font-weight:bold;font-style:italic;">Offshore platform.</span></p>
</div><br clear="all">
<ul style="list-style:none;"><li>
<p><span class="font15" style="font-weight:bold;">B. Medium-Voltage Compensation Reactors</span></p></li></ul>
<p><span class="font15">The medium-voltage cable network can produce a sizeable charging current. In an island operation, this charging reactive power would need to be supplied by the auxiliary diesel set. With the capacitance values in the range of 0.2-0.4 </span><span class="font31">〃</span><span class="font15">F/km, the charging reactive power can easily exceed 6 Mvar. In order to be able to size the backup diesel generator set for the auxiliary load only, compensation reactors are placed at the platform bus. It is also possible to use STATCOM instead of reactors if the dynamic response of the wind turbine system is found to be unsatisfactory, in which case the STATCOM may take over the fulfillment of some of the performance requirements from the wind turbine control system. The advantage of fast response and the possibility of adequate reactive power generation even at very small voltages come at a cost of higher initial investment. The overall reliability of the system may also be affected adversely.</span></p>
<p><span class="font15">a result, offshore wind farms are equipped with diesel generator sets to cover the auxiliary load and to keep all essential equipment such as climate conditioners, control and safety systems operational during these periods. The loads are fed through the tertiary winding of the wind turbine transformer or directly from the medium-voltage system using a dedicated transformer [23].</span></p>
<ul style="list-style:none;"><li>
<p><span class="font15" style="font-weight:bold;">C. Grounding Transformer</span></p></li></ul>
<p><span class="font15">Commercially available standard wind turbine transformers are of Dyn5yn5 type [35], and the step-up transformer at the collector bus, as shown in Fig. 9, is delta connected on the 33-kV side. The necessary high level of reliability calls for the network to be effectively grounded [12]. Effective grounding offers the benefit of fast fault</span></p>
<div><img src="活页夹1_files/3b75391-9.jpg" alt="" style="width:233pt;height:73pt;">
</div><br clear="all">
<div><img src="活页夹1_files/3b75391-10.jpg" alt="" style="width:265pt;height:69pt;">
</div><br clear="all">
<div><img src="活页夹1_files/3b75391-11.jpg" alt="" style="width:301pt;height:149pt;">
<p><span class="font4" style="font-weight:bold;">Fig. 9. </span><span class="font3" style="font-weight:bold;font-style:italic;">Wind farm collector system/double-sided ring configuration.</span></p>
</div><br clear="all">
<p><span class="font50">Shewarega </span><span class="font50" style="font-style:italic;">et al.</span><span class="font41" style="font-style:italic;">:</span><span class="font50"> Offshore Wind Power Generation Technologies</span></p>
<p><span class="font15">detection (in less than 150 ms) and the possibility of selectively clearing the fault, in addition to limiting the overvoltage in phases which are not directly affected by the fault. The fast fault clearing limits the thermal stress at the fault location from reaching dangerous levels. The unavailability of standard equipment for effective grounding necessitates the use of additional grounding transformers, which facilitate the fault detection capability of the protection system during single line to ground faults and limit the maximum voltages in the healthy phase. They are usually connected to the medium voltage (MV) collector buses and located on the main substation platform.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font15" style="font-weight:bold;">D. Medium-Voltage Cable Network</span></p></li></ul>
<p><span class="font15">There are a number of options for the configuration of the cable links to the offshore substation at the platform [22]. The basic consideration involves striking the optimum balance between reliability on the one hand and the cost of for the collector network on the other hand.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font15" style="font-style:italic;">1) Radial and Star Topology Options:</span><span class="font15"> The simplest arrangement for the collector system is the radial design in which a group of turbines are connected to a lateral feeder string. This arrangement enables the use of a simple protection concept, easier control possibility, and the shortest possible cable run. Since the current in the feeder away from the hub decreases, a tapered cable cross section—— with the largest at the hub end and the smallest at the farthest end of the feeder</span><span class="font33">——</span><span class="font15">can be used (thus reducing the overall cost of the cable). This topology was used for the 160-MW Horns Rev offshore wind farm in Denmark, which is the first large-scale offshore wind park [20]. The major drawback of this design is its poor voltage regulation and reduced reliability as cable or switchgear faults at the hub end of the radial string have the potential to force all downstream turbines out of operation.</span></p></li></ul>
<p><span class="font15">Both the voltage regulation and reliability problems can be improved by using the star configuration [22]. In the star topology, each turbine within a group or formation is directly connected to the hub, as shown in Fig. 10, and, as a result, a single cable outage in general affects a single turbine alone. The disadvantage is the longer cable runs and the need for a higher rated cable for the short sections, which conduct the combined current of the formation to the hub. Another disadvantage is the complex switchgear arrangement at the center of the star.</span></p><img src="活页夹1_files/3b75391-12.jpg" alt="" style="width:192pt;height:142pt;">
<p><span class="font4" style="font-weight:bold;">Fig. 10. </span><span class="font3" style="font-weight:bold;font-style:italic;">Wind farm collector system</span><span class="font54">——</span><span class="font3" style="font-weight:bold;font-style:italic;">star topology.</span></p>
<p><span class="font15">thus achieved at the expense of using more conductor material. In the double-sided loop, the basic configuration during normal operation remains radial. But the cable strings are equipped with provisions to convert the radial strings into a loop structure in contingency situations, as shown in Fig. 9, with the objective of keeping as many of the turbines as possible operational in the event of internal fault, thus addressing some of the system security issues arising from the radial design. The additional security comes at the expense of longer cable runs for a given number of wind turbines, and higher cable rating requirements throughout the string circuit.</span></p>
<p><span class="font15">In the example shown in Fig. 9, all 24 DFIM-based turbines have a rating of 6 MW and the generator transformers are Dyn5yn5 connected (although only two of the windings are shown in the figure for clarity). The turbines are grouped into two clusters. A 33-kV intrafarm cable network interconnects the turbines within each group to one another and then to the collector bus. Each section of the collector bus is connected to the two low-voltage terminals of the main three-winding transformer at the hub having the vector group Ynd5d5. A 155-kV submarine cable finally links up the wind farm to the grid onshore. The short circuit impedance across the two low-voltage terminals of the transformer is chosen relatively high to reduce the effect of internal faults in one part of the WF on the other unaffected part.</span></p>
<p><span class="font15">In [17], the topology of a wind farm consisting of 48 turbines (which is currently under construction) is given. The configuration of the collector system is almost identical with the one given in Fig. 9, which gives rise to the assumption that this topology represents the currently preferred option for an offshore wind farm. In both cases, the voltage level of the collector network is 33 kV. Typical cables in use are 240-, 630-, and 800-mm<a name="footnote1"></a><sup><a href="#bookmark1">1</a></sup></span><span class="font1" style="font-weight:bold;"><sup></sup> </span><span class="font15">aluminium cables [17]. The cable cross section is reduced toward the end of a string, with the section to the first wind turbine generator (from the hub) being 800 mm<sup><a href="#bookmark1">1</a></sup></span><span class="font1" style="font-weight:bold;"><sup></sup></span><span class="font15">, to the second and third 630 mm<sup><a href="#bookmark1">1</a></sup></span><span class="font1" style="font-weight:bold;"><sup></sup></span><span class="font15">, and the last three cable sections 240 mm<sup><a href="#bookmark1">1</a></sup></span><span class="font1" style="font-weight:bold;"><sup></sup></span><span class="font15">, and the power rating of the string is approximately 22 MW.</span></p>
<p><span class="font50">Shewarega </span><span class="font50" style="font-style:italic;">et al.</span><span class="font41" style="font-style:italic;">:</span><span class="font50"> Offshore Wind Power Generation Technologies</span></p>
<p><span class="font15">The 155/33-kV transformer has a relatively small voltage control range, for example, </span><span class="font16">±</span><span class="font15">13% in </span><span class="font16">±</span><span class="font15">6 steps. As a result, the number of voltage regulation steps is limited.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font15" style="font-weight:bold;">E. The Protection System</span></p></li></ul>
<p><span class="font15">An offshore wind park is obviously designed for unmanned operation, and all operational control functions are performed from a distance in an onshore location. Access to the site for a routine maintenance or emergency repair following a fault can take a long time. As an example, it is stated in [17] that access to the platform takes at least 2 h from the nearest island, 4-5 h from onshore under best weather conditions, and possibly several days in the worst case scenario. The costs arising from the level of complexity of the protection, therefore, need to be weighed against the effort it takes to access the fault location for manual intervention. The protection system, therefore, has to take this and a number of other salient features of an offshore wind park into consideration, in addition to being grid code compliant [14].</span></p>
<p><span class="font15">In the example shown in Fig. 9, each wind turbine generator-transformer set (WTG) is equipped with three remote controlled breakers (circuit breaker, disconnector, and earthing switch combination)——one breaker for the transformer and two breakers for the incoming and outgoing cable feeders. In case of cable fault, the section between the two transformers affected by the fault can be isolated and the rest of the system can operate normally via the ring connection at each end of a string. This leads to a flexible control and protection concept.</span></p>
<p><span class="font15">The protection concept presented here is based on [17], in which the protection system of 295-MW offshore wind park in the North Sea to be commissioned in 2013 is discussed.</span></p>
<p><span class="font15">The various protection and control devices at the different bays and transformers are connected in a ring configuration via optical fiber cables to a centralized control unit, and the communication between the different protection devices is based on the International Electrotechnical Commission (IEC) 61850 protocol. In this implementation, combined protection and control devices are used for the medium-voltage switchgears, and for the high-voltage switchgears, separate devices are used for each of the functionalities. All switching operations can be performed locally or remotely from an onshore location. These measures in combination are designed to reduce the downtimes and to guarantee the highest possible availability. The secure communication also allows a Generic Object Oriented Substation Events (GOOSE) transfer between the WTGs to enable certain functionalities/interlocks, and the downloading of the protection device status via the IEC 61850 protocol from onshore in case of a trip or maintenance.</span></p>
<p><span class="font15">The protection system types for the components of the wind park are as follows. The WTG transformer bus bars have a differential protection, while the transformers themselves are protected by overcurrent relays. All medium-voltage cables have a differential protection as the main protection and the distance protection as a backup protection. The compensation reactors connected to the 33-kV bus are equipped with the overcurrent protection, and the same applies to the 33/0.4-kV auxiliary transformer. The earthing transformer connected to the 33-kV bus has the overcurrent protection together with the earth-fault protection at its star point. The 33-kV bus bars are fitted with the bus bar protection with a separate field unit for each bus bar bay and one central unit for all bus bar segments with an integrated switch failure protection and an overcurrent protection. The high- and low-voltage windings of the main transformer have different protection schemes. While a differential protection is used on the high-voltage side with an integrated over current protection and control function, the distance protection with control function is used on the low-voltage side and the Buchholz protection as a backup. Finally, the distance protection with control function is used for the export cable linking the platform to the grid onshore.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font15" style="font-weight:bold;">F. Offshore Foundation and Platform</span></p></li></ul>
<p><span class="font15">Offshore foundation and platform designs draw on the high seas experiences of the oil and gas industry. However, increasing interest on offshore wind power in the recent past and the resources available now for research mean that the technology is evolving on its own terms.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font15" style="font-style:italic;">1) Foundation:</span><span class="font15"> The most common foundation types in use in the German waters as of now are the jacket and tripod foundations, but other types, particularly gravity foundations, can also be expected in the future [24].</span></p></li></ul>
<p><span class="font15">The jacket construction is already established in the oil industry. Its foundation is based on a steel pipe support structure with special casts on its junction points [26]. The frame of a jacket is similar to the electricity pylon, and standard steel pipes from the pipeline construction industry can be used for the jacket, which is pinned to the sea bed with piles. The transition junctions connect the square jacket foundation with the round tubular steel tower of the turbine. Since the individual components are relatively small, its production, transportation, and installation are easy. One disadvantage is the need for a remote collision protection.</span></p>
<p><span class="font15">In the tripod design, a three-legged steel frame supports the main pile under water (see Fig. 11). The three legs of the tripod are pinned to the sea bed with three smaller piles hammered into the sea bed with the depth depending on soil conditions. This technology is deemed to be more suitable for higher water depths. The tripod foundation is not suitable for use on a stony sea bed.</span></p>
<p><span class="font15">In a gravity foundation, the turbine is supported by a big concrete block similar to those used in bridge foundations. Gravity foundations have been used at some</span></p>
<p><span class="font50">Shewarega </span><span class="font50" style="font-style:italic;">et al.</span><span class="font41" style="font-style:italic;">:</span><span class="font50"> Offshore Wind Power Generation Technologies</span></p><img src="活页夹1_files/3b75391-13.jpg" alt="" style="width:216pt;height:295pt;">
<p><span class="font4" style="font-weight:bold;">Fig. 11. </span><span class="font3" style="font-weight:bold;font-style:italic;">A barge carrying tripod foundations being towed into position.</span></p>
<p><span class="font15">European wind farms for water depths of up to 10 m [3]. Cost reductions have been achieved by using different shapes. One advantage of this technology is that it is independent of steel price fluctuations. Therefore, it is likely that gravity foundations will find more and more use in deeper waters in the future.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font15" style="font-style:italic;">2) Offshore Substation Platform:</span><span class="font15"> Except for rare cases in which the distance to onshore is short, transportation of power to the grid connection point requires a high voltage and thus an offshore substation. As with the other offshore assets, size and weight are crucial design considerations. Additionally, limited accessibility and harsh environment mean that design approaches and redundancy concepts new to the power industry are required.</span></p></li></ul>
<p><span class="font15">The platform is a massive structure that accommodates the main transformer, the compensation reactors, the high- and medium-voltage switch gears, the grounding transformer, and the standby diesel generator set. In terms of weight and size, obviously the transformer is the major component. To illustrate the magnitudes involved, the following is the data from a 300-MVA platform: weight of the platform foundation: 800 T, the combined weight of the structure and equipment above water: 2000 T, of which the weight of the steel structure alone is 950 T. In a new compact offshore substation, using gas-insulated transformers is introduced. The most significant design change is the elimination of insulation oil. A prototype offshore substation built around two gas-insulated (SF6) transformers with a combined power rating of 360 MVA is introduced in the above-referenced material. By eliminating the oil and with it the auxiliary systems such as oil tank, it is reported that significant reduction in the weight of the transformer can be achieved.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font16" style="font-weight:bold;">V. THE TRANSMISSION LINK TO THE GRID ONSHORE</span></p></li></ul>
<p><span class="font15">For the transmission of power from the offshore plant to the grid connection point, choice is to be made between high-voltage alternating current (HVAC) and high-voltage direct current (HVDC) based on line commutated converter (HVDC LCC), or voltage source-based HVDC (HVDC VSC) as part of the overall project planning process.</span></p>
<p><span class="font15">Alternating current (ac) connections are based on well-known and tested transmission and distribution equipment. However, the possible transmission voltage level is constrained by the charging current. There are also other limiting operational factors. For example, in [21], it is recommended that, in addition to the maximum permissible current, voltage regulation at the receiving end between no-load and full load should remain less than 10% and the phase-angle difference between receiving- and sending-end voltages should not exceed 30</span><span class="font6">°</span><span class="font15">. This limits ac interconnection through submarine cables to transmission voltages of up to 155 kV and a transmission length of up to approximately 100 km with compensation reactors in both ends. Cables of 245 kV are also available but are as of yet not in use.</span></p>
<p><span class="font15">As stated above, the charging reactive power is considered the main limiting factor in HVAC cable utilization in long-distance transmissions. The reactive power generated by the cables is compensated using shunt reactors connected directly to both ends of the cable. To avoid any unintentional connection of the cables without the compensation reactors, both cables and reactors are switched concurrently using the same switch. The reactor on the onshore side is continuously adjustable up to the full compensation (100%) of the charging current (the onshore side is chosen for control on grounds of ease of operation). But partial compensation offers a control capability using the remaining capacitive current. The maximum value of the current after compensation should not exceed the interrupting capability of the circuit breaker, which is relatively small and the charging current alone can under circumstances exceed this value.</span></p>
<p><span class="font15">HVDC transmission is likely to be the preferred option for future offshore wind farms. Conventional HVDC transmission using line-commutated thyristor valves has higher power rating and is capable of very high transmission voltage. It is also characterized by higher transmission efficiency. Due to the low degree of controllability, lack of</span></p>
<p><span class="font50">Shewarega </span><span class="font50" style="font-style:italic;">et al.</span><span class="font41">:</span><span class="font50"> Offshore Wind Power Generation Technologies</span></p><img src="活页夹1_files/3b75391-14.png" alt="" style="width:229pt;height:64pt;">
<p><span class="font4" style="font-weight:bold;">Fig. 12. </span><span class="font3" style="font-weight:bold;font-style:italic;">WF topology with VSC-based HVDC transmission.</span></p>
<p><span class="font15">black start capability and the converter,s reactive power consumption, however, weak networks cannot be connected to this system.</span></p>
<p><span class="font15">VSC-based HVDC transmission, using self-commutated valves [IGBTs, integrated gate-commutated thyristors (IGCTs), and gate turn-offs (GTOs)], on the other hand, is available only for lower transmission voltage levels and power ratings. It is more expensive and has higher losses, which are related to the switching behavior and frequency of the self-commutated devices. However, there are also some significant advantages, which make it very suitable for the connection of large offshore wind farms, such as fast control of active and reactive power independently from one another, capability to support the system in major contingencies, black start capability, possibility of connection to weak or even passive networks, capability to reverse the power flow direction almost instantaneously, etc. Additionally, new soft-switching methods and higher level topologies for VSC-based HVDC can significantly reduce the converter losses and make this kind of transmission more economical and reliable. Fig. 12 shows a possible arrangement for an offshore wind farm link to the onshore grid using HVDC and Fig. 13 using HVAC.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font16" style="font-weight:bold;">VI. EXAMPLES OF OFFSHORE</span></p></li></ul>
<p><span class="font16" style="font-weight:bold;">WIND FARMS</span></p>
<ul style="list-style:none;"><li>
<p><span class="font15" style="font-weight:bold;">A. The Offshore Wind Plant Alpha Ventus</span></p></li></ul>
<p><span class="font15">The wind park Alpha Ventus [25] is the first ever to be installed in Germany. It is located off the northern coast within the exclusive economic zone of Germany, and designated as a pilot project primarily intended for research purposes. The wind farm contains 12 turbines in all, each with a power rating of 5 MW, and is operated by a com-</span></p><img src="活页夹1_files/3b75391-15.png" alt="" style="width:229pt;height:68pt;">
<p><span class="font4" style="font-weight:bold;">Fig. 13. </span><span class="font3" style="font-weight:bold;font-style:italic;">Offshore WF link using ac cable.</span></p><img src="活页夹1_files/3b75391-16.jpg" alt="" style="width:181pt;height:240pt;">
<p><span class="font4" style="font-weight:bold;">Fig. 14. </span><span class="font3" style="font-weight:bold;font-style:italic;">Partial view of the Alpha Ventus offshore wind park site.</span></p>
<p><span class="font15">pany called Offshore Test Field and Infrastructure, which is established as a joint venture by the power companies EWE AG (47.5% share) and E.ON Climate & Renewables GmbH and Vattenfall Europe New Energy GmbH (each with 26.25% share).</span></p>
<p><span class="font15">Two types of turbines are installed: Multibrid M5000 (from AREVA Wind, Bremerhaven, Germany) and REpower 5 M (from Repower Systems SE, Hamburg, Germany) (see Fig. 14). The Multibrid turbine M5000 has the following data: hub height 85 m (above water surface), rotor diameter 116 m, cut-in wind speed 3.5 m/s, cutout wind speed 25 m/s, and rated power at or above 12.5 m/s wind speed. The gross weight of the nacelle including the wind rotors is 309 T, and the foundation, tower, and hub turbine platform together weigh about 1000 T. The substructure is designed for a life span of 60 years.</span></p>
<p><span class="font15">The characteristic data of the REpower turbines is as follows. The rotor diameter and the hub height are 126 and 92 m, respectively. The turbines are installed on a prefabricated jacket basement. The height of the jacket basement is 57 m, weighs about 320 T, and occupies an area of 17 m </span><span class="font15" style="font-style:italic;">X</span><span class="font15"> 17 m at its base.</span></p>
<p><span class="font15">The turbines in the wind farm are clustered into groups of three to be connected to a transformer which steps up the voltage to 30 kV. A collector network then links all turbines to an offshore platform Alpha Ventus, which steps up the voltage to 110 kV, from which a 70-km-long submarine cable links the wind farm to the grid onshore.</span></p>
<p><span class="font15">Whereas the AREVA wind turbines stand on tripods, the REpower turbines are mounted on jacket foundations with a water depth of 30 m [21].</span></p>
<p><span class="font50">Shewarega </span><span class="font50" style="font-style:italic;">et al.</span><span class="font41" style="font-style:italic;">:</span><span class="font50"> Offshore Wind Power Generation Technologies</span></p>
<div><img src="活页夹1_files/3b75391-17.jpg" alt="" style="width:336pt;height:233pt;">
<p><span class="font4" style="font-weight:bold;">Fig. 15. </span><span class="font3" style="font-weight:bold;font-style:italic;">Location ofthe HelWin cluster in the North Sea [28].</span></p>
</div><br clear="all">
<ul style="list-style:none;"><li>
<p><span class="font15" style="font-weight:bold;">B. The HelWin Cluster in the North Sea</span></p></li></ul>
<p><span class="font15">The HelWin North Sea cluster is a name given to a group of offshore wind parks currently under construction. The project site is located in the German exclusive economic zone in the North Sea at a distance of about 55 km from the mainland, 35 km north of the island of Helgoland, and 37 km west of the North Frisian island of Amrum (see Fig. 15). The wind farms North Sea East, Amrumbank West, and Meerwind make up the cluster.</span></p>
<p><span class="font15">One of the sites, the North Sea East (NSE), contains in all 48 REpower 6-M wind turbines spread over an area of 24 km</span><span class="font1" style="font-weight:bold;"><sup>2</sup></span><span class="font15">, with the overall installed capacity of 295 MW. The water depth ranges from 22 to 25 m. The site is scheduled to become operational in 2013. The 48 wind turbines are connected with each other using 33-kV interarray cables linking them to the substation. The substation platform weighs approximately 2100 T, and is mounted on a steel structure as a foundation which protrudes approximately 37 m above the sea level. The tower of the wind turbines has a length of70 m above the water level. The weights of the tower and the nacelle are 243 and 350 T, respectively. The turbine swept area has a diameter of 126 m, and the three rotor blades together weigh 125 T. Jacket foundations have been used also for the turbines, and the four pedestals are anchored with the sea bed using piles. Each of these foundations has up to 50-m height, weighs approximately 550 T, and the foundation pedestals occupy an area of almost 400 m</span><span class="font1" style="font-weight:bold;"><sup>2</sup></span><span class="font15">.</span></p>
<p><span class="font15">The other site in the cluster, offshore wind park Amrumbank West, is owned by Amrumbank West GmbH, a fully owned subsidiary of E.ON AG. In this site, in all, 80 Siemens 3.6-MW 120 wind turbines are to be installed over an area of 32 km</span><span class="font1" style="font-weight:bold;"><sup>2</sup></span><span class="font15">. The site is scheduled to start operation in 2015. The third site in the HelWin cluster is the Meerwind, which launched the project activities in August 2011. When completed, the site will have 80 Siemens 3.6-MW 120 wind turbines installed with the overall capacity of 288 MW. The Siemens turbines use monopile foundation. According to the current schedule the site is to be commissioned in 2013.</span></p>
<p><span class="font15">Connection to the main grid for all sites will be undertaken by the grid operator Tennet TSO GmbH, which awarded the contract for the construction of the link to onshore to Siemens. Siemens is responsible for turnkey supply of the fully equipped floating and self-erecting platform [30].</span></p>
<p><span class="font15">As stated above, the 33-kV medium-voltage cables converge on to the substation of each of the sites. The voltage is then stepped up to a transport voltage level of 155 kV, and from there ac cables link up the substation to the offshore converter platform, on which the Siemens HVDC Plus system for high-voltage direct-current (HVDC) transmission is installed. The first of the converter platforms to be completed is Helwin Alpha, which serves as a converter station for North Sea East Wind Park, and the second converter platform is Helwin Beta built for Amrumbank West.</span></p>
<p><span class="font15">In the converter stations, the 155-kV ac voltage will be stepped up and converted into dc using Siemens HVDC Plus system. The power will then be transmitted at a voltage of </span><span class="font16">±</span><span class="font15">320 kV via submarine high-voltage cables from the feed-in point on the platform to the grid connection point in Buttel, northwest of the city of Hamburg, located at a distance of over 130 km. A special feature of the HelWin Beta offshore converter platform is that it will be connected via a bridge to its parent platform HelWin Alpha to allow</span></p>
<p><span class="font50">Shewarega </span><span class="font50" style="font-style:italic;">et al.</span><span class="font41" style="font-style:italic;">:</span><span class="font50"> Offshore Wind Power Generation Technologies</span></p><img src="活页夹1_files/3b75391-18.jpg" alt="" style="width:228pt;height:167pt;">
<p><span class="font4" style="font-weight:bold;">Fig. 16. </span><span class="font3" style="font-weight:bold;font-style:italic;">German Transmission Code fault ride through requirement.</span></p>
<p><span class="font15">shared use of the helicopter deck and crew quarters. There will also be an ac cable link to the bus bar of the platform's 155-kV switchgear and a link to the emergency power system. The HVDC VSC grid connection has a rating of 690 MW and is scheduled to be operational by 2015.</span></p>
<p><span class="font16" style="font-weight:bold;">VII. GRID INTEGRATION AND GRID CODE REQUIREMENTS</span></p>
<p><span class="font15">As a result of the rapid increase in renewable-based electricity generation, a number of transmission system operators issued grid codes imposing specific requirements concerning grid support during steady-state operation as well as grid faults [15], [16]. First among these requirements is one which stipulates that wind turbines have to remain connected during fault and provide support.</span></p>
<p><span class="font15">Fig. 16 summarizes the requirement by the German E. ON Transmission Code. In the region marked "1" tripping is not allowed at all. A Short-Term soft Interruption (STI; e.g., converter blocking due to overcurrent) is permitted in region 2, if this is required by the generator concept and a resynchronization within a certain time can be guaranteed. Additionally, the provision of reactive power by the LSC or other equipment has to be ensured during the interruption. In area 3, an STI is allowed for all types of power generation units and the resynchronization time can be higher than 2 s. Even in area 4, the units have to stay connected and can only be tripped by the higher level supervisory grid protection (Safeguard II).</span></p>
<p><span class="font15">During grid faults the reactive current control of the wind turbines must be utilized to support the grid voltage. Modern protection devices clear the fault normally in a range of 100-150 ms or less following a fault. However, this time window may be decisive for the stability of the grid and, consequently, for the whole system. The new German renewable energy law includes new regulations concerning ancillary services by specifying the reactive current to be injected into the system depending on the voltage deviation. Fig. 17 shows the required reactive current injection as a function of time for a step voltage dip of 50%. In addition to the dynamic response, as specified in</span></p>
<div>
<p><span class="font40">p 110</span><span class="font38">刀>§waurl。©></span><span class="font40">*8£ .E>p u£e>ep efoA</span></p><img src="活页夹1_files/3b75391-19.jpg" alt="" style="width:302pt;height:237pt;">
</div><br clear="all">
<p><span class="font57">time in s</span></p>
<p><span class="font4" style="font-weight:bold;">Fig. 17. </span><span class="font3" style="font-weight:bold;font-style:italic;">Voltage support requirements as per German renewable energy law.</span></p>
<p><span class="font50">Shewarega </span><span class="font50" style="font-style:italic;">et al.</span><span class="font41" style="font-style:italic;">:</span><span class="font50"> Offshore Wind Power Generation Technologies</span></p>
<div style="border-bottom:solid;">
<p><span class="font3">-50%</span></p>
<p><span class="font3">Dead band around reference voltage</span></p>
<p><span class="font3">Additional reactive current</span></p><img src="活页夹1_files/3b75391-20.jpg" alt="" style="width:255pt;height:189pt;">
<p><span class="font3">Continuation of voltage control after return into dead zone at least about 500 ms</span></p>
<p><span class="font3">Reactive_current/voltage gain: k=Al<sub>Q</sub>/AU > 2.0 p.u.</span></p>
<p><span class="font3">Within dead band, e.g. const, power factor control</span></p>
<p><span class="font3">Voltage AU/U<sub>N</sub></span></p>
<p><span class="font3">Rise time < 20 ms</span></p>
<p><span class="font4" style="font-weight:bold;">Fig. 18. </span><span class="font3" style="font-weight:bold;font-style:italic;">Reactive current injection as a function of voltage deviation.</span></p>
</div><br clear="all">
<p><span class="font3">Voltage limitation / Activation of voltage control (under-excited mode) by exceeding dead band</span></p>
<div>
<p><span class="font3">Voltage support (over-excited mode)</span></p>
</div><br clear="all">
<div>
<p><span class="font53" style="font-weight:bold;">Control characteristics</span></p>
</div><br clear="all">
<p><span class="font3">Maximum available reactive current l<sub>Q max</sub> = l<sub>N</sub></span></p>
<p><span class="font15">Fig. 17, the absolute value of the reactive current as a function of the voltage dip (as per Fig. 18) must be fulfilled. Compliance with these provisions of the grid code must be certified before wind turbines are allowed to connect to the grid.</span></p>
<p><span class="font16" style="font-weight:bold;">VIII. CONCLUSION</span></p>
<p><span class="font15">Offshore wind farm technology has experienced a major transformation in terms of both the level of installed capacity and the technological maturity. All indications are that there is a further significant growth potential in the years ahead. In this paper, the current state of the technology and the major challenges faced by the industry with emphasis on turbine control, the collector network, and the transmission link to the grid onshore have been surveyed.</span></p>
<p><span class="font15">Alternative topologies for the collector network, standard transformer types for the generator, the main substation at the collector bus, and options for reactive power compensation both at medium- and high-voltage levels have been discussed. If instead of the more common radial</span></p>
<p><span class="font54" style="font-weight:bold;">REFERENCES</span></p>
<ul style="list-style:none;"><li>
<p><span class="font13">[1] Bundesverband WindEnergie (BWE). [Online]. Available:</span><a href="http://www.wind-energie.de/"><span class="font13"> http://www.</span></a><span class="font13"> </span><a href="http://www.wind-energie.de/"><span class="font13">wind-energie.de/</span></a></p></li>
<li>
<p><span class="font13">[2] European Wind Energy Association (EWEA).</span></p></li></ul>
<p><span class="font13">[Online]. Available: </span><a href="http://www.ewea.org/"><span class="font13">http://www.ewea.org/</span></a><span class="font13"> index.php?id=203</span></p>
<ul style="list-style:none;"><li>
<p><span class="font13">[3] Deutsche Energie-Agentur (DENA). [Online].</span></p></li></ul>
<p><span class="font13">Available: </span><a href="http://www.offshore-wind.de/"><span class="font13">http://www.offshore-wind.de/</span></a><span class="font13"> page/index.php?id=12187&L=1</span></p>
<ul style="list-style:none;"><li>
<p><span class="font13">[4] C. Feltes, H. Wrede, and I. Erlich, ‘'Dynamic behaviour of DFIG-based wind turbines </span><span class="font15">connection a loop structure for the wind farm collector network is used, some of the turbines can be kept operational in the event of internal faults. However, the design and coordination of the protection system against internal faults becomes more challenging.</span></p>
<div>
<p><span class="font13">during grid faults,’’ </span><span class="font13" style="font-style:italic;">IEEJ Trans. Ind. Appl.</span><span class="font13">, vol. 128, no. 4, pp. 396-401, 2008.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font13">[5] C. Feltes, S. Engelhardt, J. Kretschmann, J. Fortmann, F. Koch, and I. Erlich, ‘‘High voltage ride-through of DFIG-based wind turbines,’’ in </span><span class="font13" style="font-style:italic;">Proc. IEEE Power Energy Soc. General Meeting</span><span class="font13">, Jul. 20-24, 2008, DOI: 10. 1109/PES.2008.4596803.</span></p></li>
<li>
<p><span class="font13">[6] I. Arana, A. Hernandez, G. Thumm, and J. Holboell, ‘‘Energization of wind turbine transformers with an auxiliary generator in a large offshore wind farm during islanded</span></p></li></ul>
</div><br clear="all"></li></ul>
<p><span class="font15">The design of offshore foundations both for the turbine and the platform together with the choice of the material used for the support structure has been reviewed. The dimensions involved in the design of the platform which accommodates the main transformer, the compensation reactors, and other equipment, have been illustrated using data from practical applications.</span></p>
<p><span class="font15">Comparison of the various transmission options for linking up the offshore wind farm to the grid onshore was the next issue of interest. AC connections are the most commonly used interconnection method for offshore wind parks at this point in time. However, the constraints regarding the transmission voltage level may tilt the choice in favor of HVDC in the future. The paper finally concludes by discussing the grid code requirements which the wind farms are required to fulfill both in steady state and during a contingency. </span><span class="font33">■</span></p>
<p><span class="font13">operation,’’ </span><span class="font13" style="font-style:italic;">IEEE Trans. Power Delivery, </span><span class="font13">vol. 26, no. 4, pp. 2792-2800, Oct. 2011.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font13">[7] I. Erlich, J. Kretschmann,</span></p></li></ul>
<ul style="list-style:none;"><li>
<p><span class="font13">S. Muller-Engelhardt, F. Koch, and</span></p></li></ul>
<p><span class="font13">J. Fortmann, ‘'Modeling of wind turbines based on doubly-fed induction generators for power system stability studies,,, in </span><span class="font13" style="font-style:italic;">Proc. IEEE Power Energy Soc. General Meeting,</span><span class="font13"> Pittsburgh, PA, Jul. 2008, DOI: 10.1109/PES.2008.</span></p>
<p><span class="font13">4596271.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font13">[8] R. Pena, J. C. Clare, and G. M. Asher, ‘‘Doubly fed induction generator using back-to-back PWM converters and its application to</span></p></li></ul>
<p><span class="font57">I Journal of</span></p>
<div><img src="活页夹1_files/3b75391-21.jpg" alt="" style="width:42pt;height:28pt;">
</div><br clear="all">
<p><a href="http://www.mdpi.com/journal/jmse"><span class="font58" style="font-weight:bold;font-style:italic;">^0/^^^ Marine Science</span></a><span class="font58" style="font-weight:bold;font-style:italic;"> and Engineering</span></p><a name="caption1"></a>
<h1><a name="bookmark2"></a><span class="font16" style="font-style:italic;"><a name="bookmark3"></a>Article</span></h1>
<p><a name="bookmark4"></a><span class="font17" style="font-weight:bold;">Offshore Wind Power Integration into Future Power Systems: Overview and Trends</span></p>
<p><a name="bookmark5"></a><span class="font16" style="font-weight:bold;">Ana Fernandez-Guillamon </span><span class="font8" style="font-weight:bold;"><sup>1,</sup></span><a href="https://orcid.org/0000-0003-2605-3269"><span class="font8" style="font-weight:bold;"><sup>+</sup>©<sub>z</sub></span></a><span class="font8" style="font-weight:bold;"> </span><span class="font16" style="font-weight:bold;">Kaushik Das </span><span class="font8" style="font-weight:bold;"><sup>2,</sup></span><a href="https://orcid.org/0000-0002-6501-7896"><span class="font8" style="font-weight:bold;"><sup>+</sup>© </span></a><span class="font16" style="font-weight:bold;">and Nicolaos A. Cutululis </span><span class="font8" style="font-weight:bold;"><sup>2,+ </sup></span><span class="font16" style="font-weight:bold;">and Angel Molina-Garcia </span><span class="font8" style="font-weight:bold;"><sup>1,+z</sup></span><a href="https://orcid.org/0000-0003-2438-1429"><span class="font8" style="font-weight:bold;">*©</span></a></p>
<ul style="list-style:none;"><li>
<p><span class="font15"><sup>1</sup> Department of Electrical Eng, Universidad Politecnica de Cartagena, 30202 Cartagena, Spain; </span><a href="mailto:[email protected]"><span class="font15">[email protected]</span></a></p></li>
<li>
<p><span class="font15"><sup>2</sup> Department of Wind Energy, Technical University of Denmark, 4000 Roskilde, Denmark; </span><a href="mailto:[email protected]"><span class="font15">[email protected]</span></a><span class="font15"> (K.D.); </span><a href="mailto:[email protected]"><span class="font15">[email protected]</span></a><span class="font15"> (N.A.C.)</span></p></li></ul>
<p><span class="font14" style="font-weight:bold;">* </span><span class="font15">Correspondence: </span><a href="mailto:[email protected]"><span class="font15">[email protected]</span></a><span class="font15">; Tel.: +34-968-32-5462 </span><span class="font27">十 </span><span class="font15">These authors contributed equally to this work.</span></p>
<p><a href="http://www.mdpi.com/2077-1312/7/11/399?type=check_update&version=1"><span class="font11">©</span><span class="font4">check for</span></a><span class="font4"> </span><span class="font53" style="font-weight:bold;">updates</span></p>
<p><span class="font16" style="font-weight:bold;">Abstract: </span><span class="font16">Nowadays, wind is considered as a remarkable renewable energy source to be implemented in power systems. Most wind power plant experiences have been based on onshore installations, as they are considered as a mature technological solution by the electricity sector. However, future power scenarios and roadmaps promote offshore power plants as an alternative and additional power generation source, especially in some regions such as the North and Baltic seas. According to this framework, the present paper discusses and reviews trends and perspectives of offshore wind power plants for massive offshore wind power integration into future power systems. Different offshore trends, including turbine capacity, wind power plant capacity as well as water depth and distance from the shore, are discussed. In addition, electrical transmission high voltage alternating current (HVAC) and high voltage direct current (HVDC) solutions are described by considering the advantages and technical limitations of these alternatives. Several future advancements focused on increasing the offshore wind energy capacity currently under analysis are also included in the paper.</span></p>
<p><span class="font16" style="font-weight:bold;">Keywords: </span><span class="font16">offshore wind energy; HVAC; HVDC; P2X; hydrogen storage; CAES</span></p>
<ul style="list-style:none;"><li>
<h2><a name="bookmark6"></a><span class="font16" style="font-weight:bold;"><a name="bookmark7"></a><a name="bookmark8"></a>1. Introduction</span></h2></li></ul>
<p><span class="font16">Energy demand has been increasing non-stop during the last decades </span><a href="#bookmark9"><span class="font16">[1]</span></a><span class="font16">. Nowadays, fossil fuel sources (i.e., coal, oil and natural gas) provide around 85% of the world energy demand, according to the BP Energy Outlook of 2019 </span><a href="#bookmark10"><span class="font16">[2]</span></a><span class="font16">. However, with the Paris climate agreement established in December 2015, this energy scenario is about to change </span><a href="#bookmark11"><span class="font16">[3]</span></a><span class="font16">. This climate agreement aims to restrict maximum increase in the global average temperature below 2 </span><span class="font57">℃</span><span class="font16"> above pre-industrial levels </span><a href="#bookmark12"><span class="font16">[4]</span></a><span class="font16">. To fulfill this goal, greenhouse gas (GHG) emission trends should drastically change </span><a href="#bookmark13"><span class="font16">[5]</span></a><span class="font16">. Consequently, the use of fossil fuels should be reduced, as they are considered as the main source of GHG emissions </span><a href="#bookmark14"><span class="font16">[6]</span></a><span class="font16">. Actually, global GHG emissions are dominated by the emissions of CO</span><span class="font36"><sub>2</sub> </span><span class="font16">due to the combustion of fossil fuels, which has been increasing continuously since 1990 </span><a href="#bookmark15"><span class="font16">[7]</span></a><span class="font16">. The power sector should be decarbonized by 2050 to meet the Paris agreement target </span><a href="#bookmark16"><span class="font16">[8]</span></a><span class="font16">. Furthermore, Liddle and Sadorsky estimated that increasing by 1% the share of non-fossil fuel electricity generation can reduce by up to 0.82% the CO</span><span class="font36">2 </span><span class="font16">emissions </span><a href="#bookmark17"><span class="font16">[9]</span></a><span class="font16">. This environmental worry is one of the reasons to promote the integration of renewable energy sources (RES) into power systems </span><a href="#bookmark18"><span class="font16">[10]</span></a><span class="font16">. Moreover, RES can also mitigate the energy dependence on fossil fuels imported from other countries </span><a href="#bookmark19"><span class="font16">[11]</span></a><span class="font16">. Apart from the economic costs of these fossil fuel imports, decreasing energy dependence increases electricity supply security </span><a href="#bookmark20"><span class="font16">[12]</span></a><span class="font16">. The International Energy Agency defines electricity supply security as the uninterrupted availability</span></p>
<p><span class="font16">of energy sources at an affordable price </span><a href="#bookmark21"><span class="font16">[13]</span></a><span class="font16">. However, political stability, market liberalization and foreign affairs are nowadays linked to energy supply security </span><a href="#bookmark22"><span class="font16">[14]</span></a><span class="font16">. As a consequence, it is important to be energy-independent to guarantee the energy security of a country </span><a href="#bookmark23"><span class="font16">[15]</span></a><span class="font16">.</span></p>
<p><span class="font16">While RES provide an acceptable solution for these two problems, they also face many challenges as their integration increases into the grids, mostly based on their intermittency, variability and uncertainty due to their dependency on weather conditions </span><a href="#bookmark24"><span class="font16">[16]</span></a><span class="font16">. Actually, they are usually considered as ‘non-dispatchable’ sources </span><a href="#bookmark25"><span class="font16">[17]</span></a><span class="font16">. This fact makes them hard to integrate into power systems </span><a href="#bookmark26"><span class="font16">[18]</span></a><span class="font16">, as transmission system operators (TSOs) have to deal with not only the uncontrollable demand but also uncontrollable generation [19,20]. RES include bioenergy, geothermal energy, hydropower, ocean energy (tide and wave), PV, thermal solar energy and wind energy (onshore and offshore) [21]. Some of them (such as wind and solar installations) are connected to the grid through power electronic converters, reducing the rotational inertia of the system as they replace conventional generation units [22,23]. This fact compromises the frequency stability and alters the transient response [24]. As a result, several frequency control strategies have been proposed in the specific literature [25-30]. Other alternatives to increase the RES share in power systems and avoid the aforementioned problems are to complement one source with another (for instance, wind with solar and/or hydropower) [31-33] or to use storage systems (such as flywheels, pumped hydroelectric storage, batteries, hydrogen, etc.) [34,35].</span></p>
<p><span class="font16">Among these renewable technologies, wind is one of the most economic, prominent and matured RES technologies [36,37]. In fact, since 2001, global cumulative installed wind capacity has shown an exponential growth, as can be seen in Figure</span><a href="#bookmark27"><span class="font16"> 1a</span></a><span class="font16">. Among the total wind capacity, 23 GW came from offshore installations in 2018, compared to 1 GW in 2007, refer to Figure</span><a href="#bookmark27"><span class="font16"> 1b</span></a><span class="font16"> [38]. Despite offshore wind energy dating back to the 1990s, its popularity started around ten years ago [39]. This increase is due to the current interest of the wind energy industry in offshore wind power [40]. For instance, offshore wind energy investments surpassed onshore investments in Europe in 2016, as presented in [41]. Moreover, nearly 40% of the total wind capacity is expected to come from offshore wind energy in Europe in 2030 [42,43].</span></p>
<p><span class="font16">In addition, offshore wind energy presents many advantages compared to onshore wind power plants, especially related to wind energy potential [44,45]: (</span><span class="font16" style="font-style:italic;">i</span><span class="font16">) Offshore mean wind speeds are higher and wind power variability is also lower than onshore wind power; (</span><span class="font16" style="font-style:italic;">ii</span><span class="font16">) their visual and acoustic impact is usually lower than onshore; subsequently (</span><span class="font16" style="font-style:italic;">iii</span><span class="font16">) larger wind turbines (WTs) can be installed [46]. Actually, on the European coasts, the available offshore wind energy is about 350 GW [47]; the USA’s shores present an offshore wind power potential of more than 2000 GW [48]; the offshore wind resource in China is about 500 GW in water depth under 50 m [49]; and the east and west Indian coasts have an offshore wind potential of 4.4 GW and 6.7 GW, respectively [50].</span></p>
<p><span class="font16">Furthermore, offshore wind speed usually increases with distance from the shore, thus increasing the power generated, as it depends on the cube of the wind speed [51]. However, higher installation and maintenance costs of offshore wind power plants (OWPP) far from the shore balance the benefits of higher energy production [52]. Indeed, OWPP are around 50% more expensive than onshore wind power plants [53], but their costs are expected to decline up to 35% by 2025 [54]. The global weighted average levelized cost of energy (LCOE) in 2018 was 20% lower than in 2010. These cost reductions can be a result of [55]:</span></p>
<ul style="list-style:none;"><li>
<p><span class="font4">•</span><span class="font16"> The evolution in wind turbine technology, installation and logistics</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> The economies of scale in operations and maintenance</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> The improved capacity factors due to higher hub heights, better wind resources and larger rotor diameters</span></p></li></ul>
<p><span class="font16">This paper analyzes and reviews different aspects of offshore wind power plants, including several future alternatives to increase the offshore wind power capacity. The rest of the paper is organized as follows: Section</span><a href="#bookmark28"><span class="font16"> 2 </span></a><span class="font16">presents the current status of offshore wind power plants (WTs and OWPP sizes,</span></p>
<p><a name="bookmark27"></a><span class="font16">water depth, distance from shore and electrical transmission to shore). Future advancements possible for larger offshore wind power plant integration are analyzed in Section</span><a href="#bookmark29"><span class="font16"> 3.</span></a><span class="font16"> Finally, Section</span><a href="#bookmark30"><span class="font16"> 4 </span></a><span class="font16">gives the conclusions.</span></p>
<div>
<p><span class="font37" style="font-weight:bold;">(M°)-loBdB。PHM P-IB+SH OA--nrnn</span><span class="font28">。</span></p><img src="活页夹1_files/3b75391-22.jpg" alt="" style="width:328pt;height:172pt;">
</div><br clear="all">
<div>
<p><span class="font38">25</span></p>
<p><span class="font38">20</span></p>
<p><span class="font38">15</span></p>
<p><span class="font38">10</span></p><img src="活页夹1_files/3b75391-23.jpg" alt="" style="width:313pt;height:150pt;">
</div><br clear="all">
<div>
<p><span class="font38">5</span></p><img src="活页夹1_files/3b75391-24.jpg" alt="" style="width:293pt;height:42pt;">
<p><span class="font14" style="font-weight:bold;">Figure 1. </span><span class="font15">Global cumulative wind capacity in GW. (</span><span class="font14" style="font-weight:bold;">a</span><span class="font15">) Global cumulative wind capacity: Onshore and offshore. (</span><span class="font14" style="font-weight:bold;">b</span><span class="font15">) Global cumulative offshore wind capacity.</span></p>
</div><br clear="all">
<ul style="list-style:none;"><li>
<p><a name="bookmark28"></a><span class="font16" style="font-weight:bold;">2. Current Status of Offshore Wind Power Plants</span></p>
<ul style="list-style:none;">
<li>
<p><span class="font16" style="font-style:italic;">2.1. Preliminaries</span><span class="font42" style="font-style:italic;">:</span><span class="font16" style="font-style:italic;"> Classification ofWind Turbines</span></p></li></ul></li></ul>
<p><span class="font16">WTs are usually classified as fixed speed wind turbines (FSWTs) and variable speed wind turbines (VSWTs) [56]. FSWTs work at the same rotational speed regardless of the wind speed [57]. VSWTs can operate around their optimum power point for each wind speed, using a partial or full additional power converter [58]. As a result, VSWTs are more efficient than FSWTs [59]. Moreover, WTs present different topologies depending on their generator [60]: type 1 includes a squirrel cage induction generator; type 2 includes a wound rotor induction generator; type 3 includes a doubly-fed induction generator (DFIG); and type 4 includes a full-converter synchronous generator [61]. Types 1 and 2 are FSWTs, whereas types 3 and 4 are VSWTs.</span></p>
<p><span class="font16">Nowadays, VSWTs are the most commonly installed WTs [62-65]. Among them, full converter generator WTs seem to be a better option than DFIG-based WTs for OWPP [66-72]. The main differences between DFIG and full-converter WTs are the following:</span></p>
<p><span class="font16">The DFIG configuration needs a gearbox, generator and partial-scale power converter (around 30%), as shown in Figure</span><a href="#bookmark31"><span class="font16"> 2a</span></a><span class="font16">. The gearbox couples the blades with the generator, increasing the rotational speed from the rotor hub to the induction machine [73-75]. The stator is directly connected to the grid, whereas the rotor is connected to the power converter [76]. As a result, the converter only covers the power produced by the rotor of the DFIG [77].</span></p>
<p><a name="bookmark31"></a><span class="font16">The synchronous generator of a full-converter WT is excited by an external DC source or by permanent magnets [78]. In this case, the hole generator is connected to the grid through a power converter [79]. Hence, all the generated power from a WT can be regulated accordingly [80]. They have low maintenance costs and negligible rotor losses [81]. Moreover, some type 4 WTs have no gearbox, as depicted with a dotted line in Figure</span><a href="#bookmark31"><span class="font16"> 2b</span></a><span class="font16">, using a direct driven multipole generator [82].</span></p>
<div><img src="活页夹1_files/3b75391-25.jpg" alt="" style="width:198pt;height:104pt;">
<p><span class="font16">(</span><span class="font16" style="font-weight:bold;">a</span><span class="font16">)</span></p>
</div><br clear="all">
<div><img src="活页夹1_files/3b75391-26.jpg" alt="" style="width:199pt;height:105pt;">
<p><span class="font16">(</span><span class="font16" style="font-weight:bold;">b</span><span class="font16">)</span></p>
<p><span class="font14" style="font-weight:bold;">Figure 2. </span><span class="font15">Variable speed wind turbines types. (</span><span class="font14" style="font-weight:bold;">a</span><span class="font15">) Doubly-fed induction generator (DFIG) wind turbine. (</span><span class="font14" style="font-weight:bold;">b</span><span class="font15">) Full-converter wind turbine.</span></p>
</div><br clear="all">
<ul style="list-style:none;"><li>
<p><span class="font16" style="font-style:italic;">2.2. Offshore Trends</span><span class="font42" style="font-style:italic;">:</span><span class="font16" style="font-style:italic;"> Turbine Capacity, Wind Power Plant Capacity, Depth and Distancefrom the Shore</span></p></li></ul>
<p><a name="bookmark32"></a><span class="font16">In Europe, the rated capacity of offshore WTs has been continuously increasing during the last decade. For instance, in 2017, the average rated capacity of WTs was 5.9 MW, compared to 3 MW in 2010 and 4.8 MW in 2016 [83]. In 2018, new offshore WTs were 6.8 MW on average, 15% larger than in 2017. Comparing 2018 to 2010, the average WT increase is more than 200%. Moreover, two 8.8 MW offshore WTs were installed in the United Kingdom in 2018, those being the largest WTs installed of the world. The commercial model of those WTs was V164-8.8 MW from MHI Vestas Offshore [84]. However, nowadays there are larger commercial offshore WTs, up to 12 MW, as presented in [85]. Table</span><a href="#bookmark32"><span class="font16"> 1 </span></a><span class="font16">shows the 10 largest WTs currently available. All of them have a rated power over 8 MW, rotor diameters between 150 and 200 m and are equipped with synchronous generators (type 4).</span></p>
<p><span class="font14" style="font-weight:bold;">Table 1. </span><span class="font15">Biggest wind turbines currently available.</span></p>
<table border="1">
<tr><td style="vertical-align:middle;">
<p><span class="font56">Rated Power (MW)</span></p></td><td style="vertical-align:middle;">
<p><span class="font56">Manufacturer</span></p></td><td style="vertical-align:middle;">
<p><span class="font56">Reference</span></p></td><td style="vertical-align:middle;">
<p><span class="font56">Diameter (m)</span></p></td><td style="vertical-align:middle;">
<p><span class="font56">Generator</span></p></td></tr>
<tr><td style="vertical-align:bottom;">
<p><span class="font14">8.0</span></p></td><td style="vertical-align:bottom;">
<p><span class="font14">Siemens Gamesa</span></p></td><td style="vertical-align:bottom;">
<p><span class="font14">SG 8.0-167 DD</span></p></td><td style="vertical-align:bottom;">
<p><span class="font14">167</span></p></td><td style="vertical-align:bottom;">
<p><span class="font14">Synchronous permanent</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font14">8.3</span></p></td><td style="vertical-align:top;">
<p><span class="font14">MHI Vestas Offshore</span></p></td><td style="vertical-align:top;">
<p><span class="font14">V164-8.3 MW</span></p></td><td style="vertical-align:top;">
<p><span class="font14">164</span></p></td><td style="vertical-align:top;">
<p><span class="font14">Synchronous permanent</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font14">8.8</span></p></td><td style="vertical-align:top;">
<p><span class="font14">MHI Vestas Offshore</span></p></td><td style="vertical-align:top;">
<p><span class="font14">V164-8.8 MW</span></p></td><td style="vertical-align:top;">
<p><span class="font14">164</span></p></td><td style="vertical-align:top;">
<p><span class="font14">Synchronous permanent</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font14">9.0</span></p></td><td style="vertical-align:top;">
<p><span class="font14">MHI Vestas Offshore</span></p></td><td style="vertical-align:top;">
<p><span class="font14">V164-9.0 MW</span></p></td><td style="vertical-align:top;">
<p><span class="font14">164</span></p></td><td style="vertical-align:top;">
<p><span class="font14">Synchronous permanent</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font14">9.5</span></p></td><td style="vertical-align:top;">
<p><span class="font14">MHI Vestas Offshore</span></p></td><td style="vertical-align:top;">
<p><span class="font14">V164-9.5 MW</span></p></td><td style="vertical-align:top;">
<p><span class="font14">164</span></p></td><td style="vertical-align:top;">
<p><span class="font14">Permanent magnet</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font14">10.0</span></p></td><td style="vertical-align:top;">
<p><span class="font14">AMSC</span></p></td><td style="vertical-align:top;">
<p><span class="font14">wt10000dd SeaTitan</span></p></td><td style="vertical-align:top;">
<p><span class="font14">190</span></p></td><td style="vertical-align:top;">
<p><span class="font14">HTS synchronous</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font14">10.0</span></p></td><td style="vertical-align:top;">
<p><span class="font14">MHI Vestas Offshore</span></p></td><td style="vertical-align:top;">
<p><span class="font14">V164-10.0MW</span></p></td><td style="vertical-align:top;">
<p><span class="font14">164</span></p></td><td style="vertical-align:top;">
<p><span class="font14">Permanent magnet</span></p></td></tr>
<tr><td style="vertical-align:top;"></td><td style="vertical-align:top;"></td><td style="vertical-align:top;">
<p><span class="font14">YZ150/10.0</span></p></td><td style="vertical-align:top;">
<p><span class="font14">150</span></p></td><td style="vertical-align:top;"></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font14">10.0</span></p></td><td style="vertical-align:top;">
<p><span class="font14">Swiss Electric</span></p></td><td style="vertical-align:top;">
<p><span class="font14">YZ170/10.0</span></p></td><td style="vertical-align:top;">
<p><span class="font14">170</span></p></td><td style="vertical-align:top;">
<p><span class="font14">Synchronous permanent</span></p></td></tr>
<tr><td style="vertical-align:top;"></td><td style="vertical-align:top;"></td><td style="vertical-align:top;">
<p><span class="font14">YZ190/10.0</span></p></td><td style="vertical-align:top;">
<p><span class="font14">190</span></p></td><td style="vertical-align:top;"></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font14">10.0</span></p></td><td style="vertical-align:top;">
<p><span class="font14">Siemens Gamesa</span></p></td><td style="vertical-align:top;">
<p><span class="font14">SG 10.0-193 DD</span></p></td><td style="vertical-align:top;">
<p><span class="font14">193</span></p></td><td style="vertical-align:top;">
<p><span class="font14">Synchronous permanent</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font14">12.0</span></p></td><td style="vertical-align:top;">
<p><span class="font14">General Electric</span></p></td><td style="vertical-align:top;">
<p><span class="font14">GE HALIADE-X</span></p></td><td style="vertical-align:top;">
<p><span class="font14">220</span></p></td><td style="vertical-align:top;">
<p><span class="font14">Synchronous permanent</span></p></td></tr>
</table>
<p><span class="font16">Regarding OWPP capacity, it has also increased dramatically in the last 10 years (around 700%), in line with the increase of average offshore WT capacity. In fact, average OWPP capacity was 79.6 MW in 2007. In contrast, 561 MW was the average capacity for OWPPs in 2018 [84]. This means that considering the average WT and OWPP capacities of the year 2018, each OWPP has between 80 and 85 WTs. On the other hand, OWPP depth and distance to the shore have not increased that much in recent years. At the end of 2013, the average water depth of OWPPs was 16 m with an average distance to the shore of 29 km [86]. In 2018, the average water depth of OWPPs under construction was 27.1 m, with an average distance to shore of 33 km. This means that water depth has increased by 170% and distance to shore by around 110%. There are some OWPPs that should be mentioned: Hornsea One (UK) and EnBW Hohe See (Germany) are the OWPPs located farthest from the shore (103 km away); Kincardine Pilot (Scotland), a floating demonstration project, has a water depth of 77 m [84]; and Hywind (Scotland), the first fully operational floating wind farm, with water depths varying between 95 and 129 m [87].</span></p>
<ul style="list-style:none;"><li>
<p><span class="font16" style="font-style:italic;">2.3. Offshore Wind Power Electrical Power Transmission</span></p></li></ul>
<p><a name="bookmark33"></a><span class="font16">For the electrical power transmission from the OWPP plant to the shore, there are two possibilities: (</span><span class="font16" style="font-style:italic;">i</span><span class="font16">) High voltage alternating current (HVAC) and (</span><span class="font16" style="font-style:italic;">ii</span><span class="font16">) high voltage direct current (HVDC). Figure</span><a href="#bookmark33"><span class="font16"> 3</span></a><span class="font16"> depicts an overview of the current state of offshore wind power energy transmission to the shore.</span></p>
<p><span class="font11">(</span><span class="font16">HVAC</span></p>
<p><span class="font4" style="font-style:italic;">(</span><span class="font26" style="font-variant:small-caps;">lcC HVDc</span><span class="font7" style="font-variant:small-caps;">J</span><span class="font16"> VSC</span></p>
<p><span class="font35">(</span><span class="font16">DRU</span></p>
<p><span class="font14" style="font-weight:bold;">Figure 3. </span><span class="font15">Offshore wind power plant transmission.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font16">2.3.1. High Voltage AC</span></p></li></ul>
<p><span class="font16">HVAC transmissions were mostly used for OWPPs until the year 2010 [88]. Their easy protection system design and the use of transformers to change between different voltage levels were the main reasons to use them [89]. However, the high capacitance of submarine HVAC cables combined with the low resistivity of sea water caused different electromagnetic dynamic and transient problems from those of conventional overhead lines, such as distortion of the voltage’s shape due to resonance problems [90,91]. This high capacitance also leads to substantial charging currents, subsequently reducing the active power transmission capacity and transmitting reactive power in long distances [92]. A possible solution could be to install reactive power compensation units along the HVAC submarine cables, but they are expensive devices and it is a difficult task to carry out [93]. an alternative found in the literature is to add compensation units only at both ends (onshore and offshore) of the underwater cables, which improve the current profile along them [94,95]. However, their effect is very limited for distances over 60-75 km [96,97]. With the aforementioned considerations, the topology for HVAC transmission from OWPPs is depicted in Figure</span><a href="#bookmark34"><span class="font16"> 4 </span></a><span class="font16">[98,99]. It consists of:</span></p>
<ul style="list-style:none;"><li>
<p><span class="font4">•</span><span class="font16"> An offshore substation to increase the offshore voltage level (usually from 30-36 kV) to the transmission voltage level at 132-400 kV.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> Three-core HVAC submarine transmission cables.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> Reactive compensation units on both ends (offshore and onshore), such as static VAR compensators (SVCs) or static synchronous compensators (STATCOMs).</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> An onshore substation, if the onshore interconnecting grid voltage is different from the offshore transmission system rated voltage.</span></p></li></ul>
<p><span class="font36">Shore line</span></p><img src="活页夹1_files/3b75391-27.png" alt="" style="width:348pt;height:79pt;">
<p><span class="font36">HV transformer & compensation HV transformer & compensation</span></p>
<p><span class="font14" style="font-weight:bold;">Figure 4. </span><span class="font15">Offshore wind power plant high voltage alternating current (HVAC) transmission system.</span></p>
<p><span class="font16">As can be seen, the OWPP grid is synchronously coupled to the main onshore grid. This is another problem of HVAC links for OWPPs, as all faults in either the grid or the OWPP are propagated to the other one [100].</span></p>
<ul style="list-style:none;"><li>
<p><span class="font16">2.3.2. High Voltage DC</span></p></li></ul>
<p><a name="bookmark35"></a><span class="font16">High voltage direct current (HVDC) transmission is considered as the best solution to OWPPs located far away from the land [101]. Actually, some studies conclude that HVDC links are economically viable for distances above 50-70 km [102]. A graphical comparison of costs between HVAC and HVDC transmission systems can be seen in Figure</span><a href="#bookmark35"><span class="font16"> 5 </span></a><span class="font16">[103].</span></p><img src="活页夹1_files/3b75391-28.jpg" alt="" style="width:255pt;height:168pt;">
<p><span class="font14" style="font-weight:bold;">Figure 5. </span><span class="font15">AC and DC system costs based on the transmission distances.</span></p>
<p><span class="font16">Figure</span><a href="#bookmark36"><span class="font16"> 6 </span></a><span class="font16">shows the main elements of an HVDC connection, and consists of [104,105]:</span></p>
<ul style="list-style:none;"><li>
<p><span class="font4">•</span><span class="font16"> An offshore substation to increase the voltage level to the level of the transmission line.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> AC/DC rectifier.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> AC and DC filters to cancel the low order harmonics. Furthermore, the AC filters supply some of the reactive power used by the converter, whereas the DC filters avoid the generation of circulating AC currents in the cable.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> DC current filtering reactance. This removes the possibility of a current interruption under minimum load circumstances, limiting DC fault currents and also reducing current harmonics in the DC cable.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> DC cables.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> DC/AC converter.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> An onshore substation.</span></p></li></ul>
<p><span class="font2">Shore line</span></p><img src="活页夹1_files/3b75391-29.jpg" alt="" style="width:414pt;height:76pt;">
<p><span class="font2">HV transformer & AC/DC converter DC/AC converter & HV transformer</span></p>
<p><span class="font14" style="font-weight:bold;">Figure 6. </span><span class="font15">Offshore wind power plant HVDC transmission system.</span></p>
<p><span class="font16">In contrast to the HVAC topology presented in Figure</span><a href="#bookmark34"><span class="font16"> 4,</span></a><span class="font16"> the HVDC link electrically decouples both the OWPP and the onshore grid, avoiding the propagation of possible disturbances between them [106,107].</span></p>
<p><a name="bookmark37"></a><span class="font16">Two different HVDC technologies are currently under use: Line-commutated converters (LCCs) based on thyristors and voltage-source converters (VSCs) based on insulated gate bipolar transistors (IGBTs) [108]. Among them, there is not a clear consensus about which technology is better: Some authors consider that LCCs are superior to VSCs in terms of reliability, cost and efficiency [26], whereas others affirm that the VCS-HVDC transmission system is the most promising technology [109]. a comparison between both HVDC technologies is summarized in Table</span><a href="#bookmark37"><span class="font16"> 2 </span></a><span class="font16">[110]. Recently, another technology called the diode rectifier unit (DRU) has been under discussion, though has not been implemented yet [111].</span></p>
<p><span class="font14" style="font-weight:bold;">Table 2. </span><span class="font15">Comparison between line-commutated converter (LCC) and voltage-source converter (VSC) HVDC technologies.</span></p>
<table border="1">
<tr><td style="vertical-align:middle;">
<p><span class="font14" style="font-weight:bold;">Technology</span></p></td><td style="vertical-align:middle;">
<p><span class="font14" style="font-weight:bold;">LCCs</span></p></td><td style="vertical-align:middle;">
<p><span class="font14" style="font-weight:bold;">VSCs</span></p></td></tr>
<tr><td style="vertical-align:bottom;">
<p><span class="font15">Semiconductor</span></p></td><td style="vertical-align:bottom;">
<p><span class="font15">Thyristor</span></p></td><td style="vertical-align:bottom;">
<p><span class="font15">IGBT</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font15">Control</span></p></td><td style="vertical-align:top;">
<p><span class="font15">Turn on</span></p></td><td style="vertical-align:top;">
<p><span class="font15">Turn on/off</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font15">Power control</span></p></td><td style="vertical-align:top;">
<p><span class="font15">Active</span></p></td><td style="vertical-align:top;">
<p><span class="font15">Active & Reactive</span></p></td></tr>
<tr><td style="vertical-align:bottom;">
<p><span class="font15">AC filters</span></p></td><td style="vertical-align:bottom;">
<p><span class="font15">Yes</span></p></td><td style="vertical-align:bottom;">
<p><span class="font15">No</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font15">Blackstart capability</span></p></td><td style="vertical-align:top;">
<p><span class="font15">No</span></p></td><td style="vertical-align:top;">
<p><span class="font15">Yes</span></p></td></tr>
</table>
<p><span class="font16">Line-Commutated Converters</span></p>
<p><span class="font16">Traditionally, HVDC transmission systems have been based on LCCs, which use thyristors as the base technology. Actually, LCC is a trusted and mature technology [112] that links a mainland with some islands (e.g., in Northern Europe [113]). However, solutions based on thyristors usually involve the injection of some harmonics. For example, a twelve-pulse thyristor bridge, which is made up of two six-pulse bridges; the fifth and seventh harmonics can be canceled [114]. The LCC-HVDC transmission system is based on this twelve-step bridge [115,116].</span></p>
<p><span class="font16">The main drawbacks of the LCC-HVDC link are [116-120]:</span></p>
<ul style="list-style:none;"><li>
<p><span class="font4">•</span><span class="font16"> It can only transfer power between (at least) two active grids. As a result, an auxiliary start-up system is necessary in the OWPP.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> It demands reactive power, which needs to be supplied through reactive support devices.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> Despite most harmonics being canceled by using a twelve-pulse bridge, others still remain, thus needing additional filters.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> It requires voltage support for the OWPP AC bus. Two possible solutions can be found to overcome this requirement: (</span><span class="font16" style="font-style:italic;">i</span><span class="font16">) Installing a dedicated STATCOM, which increases considerably the overall cost or (</span><span class="font16" style="font-style:italic;">ii</span><span class="font16">) controlling the turbine inverters individually, which is technically challenging.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> The inverter is susceptible to commutation failures, especially when connected to weak AC power systems.</span></p></li></ul>
<p><span class="font16">Blasco et al. suggest that the filter’s design depends on the harmonic characteristics of the AC grid and the active power exchanged by the LCC-HVDC link, thus needing a detailed AC power system analysis [121].</span></p>
<p><span class="font16">Voltage-Source Converters</span></p>
<p><span class="font16">Since 2005, VSC-HVDC technology has been used in offshore applications. It is based on IGBTs [122]. The main characteristics of the VSC-HVDC link are summarized as [123-125]:</span></p>
<ul style="list-style:none;"><li>
<p><span class="font4">•</span><span class="font16"> It can control active and reactive power simultaneously.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> It can feed island-mode, weak AC and passive networks.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> Its station requires less space than that of an LCC (about 60% less).</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> The cables are lighter.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> It does not require reactive power compensation.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> It can transmit power from zero to full-rating bidirectional, enabling OWPP start-up (black start operation) and working at low wind speeds.</span></p></li></ul>
<p><span class="font16">Despite all these advantages, VSC-HVDC presents higher commutation losses and costs compared to the LCC-HVDC. Moreover, it can only handle limited voltage and power levels [126].</span></p>
<p><span class="font16">Diode Rectifier Unit</span></p>
<p><span class="font16">During the last years, DRU-HVDC has been under discussion. A DRU includes several diodes, a transformer and a smoothing reactor [127]. As DRU can only convert AC to DC [128], a hybrid topology combining DRU and VSC/LCC must be used, introducing the DRU as the offshore rectifier and the LCC/VSC as the onshore converter [129]. The main advantages of DRU-HVDC compared to LCC-HVDC and VSC-HVDC are [130-133]:</span></p>
<ul style="list-style:none;"><li>
<p><span class="font4">•</span><span class="font16"> Reduction of volume (80%) and weight (66%) of the platform.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> Smaller footprints.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> Reduction of power losses up to 20%.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> Reduction of total cost up to 30%.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> Capacity increased by 33%.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> Higher reliability and efficiency.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> Modular design and full encapsulation.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> Reduced operation and maintenance costs.</span></p></li></ul>
<p><span class="font16">However, several problems have to be solved before implementing a DRU-HVDC connection [132-135]:</span></p>
<ul style="list-style:none;"><li>
<p><span class="font4">•</span><span class="font16"> As the DRU is a non-controllable passive device, the OWPP AC system must be regulated and controlled by the WT, thus requiring different WT and OWPP schemes.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> The onshore converter (LCC/VSC) controls the HVDC voltage. Subsequently, the DRU output DC voltage must be higher than the minimum voltage value to start conducting and transmit the power to the onshore station.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> Passive filters or active compensation devices are needed to remove the harmonic currents injected by the DRU.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> Voltage and frequency control stages are needed in the offshore grid for DRU commutation.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> A DRU is not able to provide auxiliary active power for the WT and OWPP substation, being then a drawback to the self-start of WTs.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> A DRU is not able to provide reactive power, needing power converters or other devices to compensate it.</span></p></li></ul>
<ul style="list-style:none;"><li>
<p><a name="bookmark29"></a><span class="font16" style="font-weight:bold;">3. Potential Future Advancements for Offshore Wind Energy</span></p></li></ul>
<p><span class="font16">In 2018, ENTSO-E and ENTSO-G published their Ten Year Network Development Plan (TYNDP) scenarios. It was the first time that both European electrical and gas TSOs collaborated together. The TYNDP 2018 covers from 2020 to 2040 [136]. In 2030-2040, it is expected that between 45 and 75% of the overall European demand will be covered by RES, especially by hydro, wind and solar power. Actually, in the North Sea and Baltic Sea regions, the offshore wind power capacity is estimated to reach between 40 and 59 GW in 2030, and between 86 and 127 GW in 2040, according to the TYNDP. Other authors propose similar offshore wind power capacity scenarios in these regions; for instance, scenarios were modeled and optimized by Koivisto and Gea-Bermudez [137]. Greenpeace published in 2015 their ‘Energy [Revolution' forecast, where 148 GW of offshore wind capacity is expected to be installed in Europe in 2050 [138]. In the US, the Department of Energy considers that 22 GW of OWPPs can be installed by 2030, increasing up to 86 GW by 2050 [139]; according to the scenarios presented by the Energy Resources Institute of India for 2050, it could have 170 GW installed of offshore wind energy by then [140]; and the Chinese scenarios propose to install 200 GW of OWPPs (150 GW near offshore wind and 50 GW far offshore wind) by 2050 [141,142]. By these means, OWPPs seem to have an important energy role in the future worldwide.</span></p>
<p><span class="font16">However, onshore wind and other conventional fossil fuel technologies are currently cheaper than offshore wind energy [143]. As a consequence, different alternatives are being researched to reduce further costs of offshore wind power development:</span></p>
<p><span class="font16">Power-to-X conversion (P2X)</span></p>
<p><span class="font16">North Sea Wind Power Hub: The Hub-and-Spoke project</span></p>
<p><span class="font16">Offshore storage options</span></p>
<p><span class="font16">These initiatives are discussed in detail in the following.</span></p>
<ul style="list-style:none;"><li>
<p><a name="bookmark38"></a><span class="font16" style="font-style:italic;">3.1. Power-to-X Conversion</span></p></li></ul>
<p><span class="font16">P2X is based on converting power (electricity) to diverse substances (X) [144]. The different alternatives available in the P2X conversion are [145,146]:</span></p>
<p><span class="font16">Power-to-heat (P2H): The electrical generation excess is linked to a heat device (electric boiler, heat pump), avoiding any intermediate energy carrier and subsequently increasing the global efficiency. Power-to-liquid (P2L): Different alternatives can be found in the specific literature, including the production of syngas through hydrogenation of CO</span><span class="font36">2 </span><span class="font16">and reverse water gas shift; co-electrolysis of CO</span><span class="font36">2 </span><span class="font16">and H</span><span class="font36">2</span><span class="font16">O; or directly through the electro-reduction of CO</span><span class="font36">2 </span><span class="font16">to methanol.</span></p>
<p><span class="font16">Power-to-chemicals (P2C): From the syngas obtained with the power-to-liquid conversion, several compounds can be produced accordingly.</span></p>
<p><span class="font16">Power-to-gas (P2G): Hydrogen is obtained from an electrolysis process and the possible subsequent conversion to methane with CO</span><span class="font36">2</span><span class="font16">.</span></p>
<p><span class="font16">Power-to-mobility (P2M): The electrical generation excess is used by the mobility sector through electric vehicles with an electric motor of 90% efficiency instead of an internal combustion engine (efficiency of 20%) or fuel cell (efficiency of 50%).</span></p>
<p><span class="font16">Power-to-power (P2P): Electricity is converted into chemical or mechanical energy, which is stored and later reconverted into electric power.</span></p>
<p><span class="font16">These transformations are expected to be very relevant in future power systems, as the generated electricity excess can be stored in different ways and later used as, for instance, fuel for power plants [147]. Hence, the system’s flexibility would be enhanced [148]. By these means, high capacity P2X plants could increase the RES supply by providing supply security in terms of storage facilities [149]. Moreover, as explained in [150], the P2X conversion provides a real link between different sectors, promoting the transition towards a future urban smart energy system. As an example, Figure</span><a href="#bookmark39"><span class="font16"> 7 </span></a><span class="font16">depicts</span></p>
<p><a name="bookmark39"></a><span class="font16">the power-to-heat conversion joint [151]. an exhaustive analysis of 128 P2X demo projects in operation in Europe is discussed in [152]. These projects aim to gain experience with system integration of P2X components. Moreover, Denmark is interested in the conversion of electricity to hydrogen and liquid fuels through P2X solutions. Thus, they can become a front-runner in this technology as large Danish companies already work with it [153].</span></p>
<div>
<p><span class="font2">Centralized electricity infrastructure</span></p>
<p><span class="font2">Decentralized electricity infrastructure</span></p><img src="活页夹1_files/3b75391-30.jpg" alt="" style="width:295pt;height:26pt;">
</div><br clear="all">
<div><img src="活页夹1_files/3b75391-31.jpg" alt="" style="width:392pt;height:100pt;">
</div><br clear="all">
<div><img src="活页夹1_files/3b75391-32.jpg" alt="" style="width:25pt;height:25pt;">
<p><span class="font0">Heat plants and CHP plants</span></p>
</div><br clear="all">
<div><img src="活页夹1_files/3b75391-33.jpg" alt="" style="width:11pt;height:25pt;">
</div><br clear="all">
<div>
<p><span class="font0">Centralized heat storage</span></p>
</div><br clear="all">
<div>
<p><span class="font46">奈</span></p>
<p><span class="font0">Centralized heat pumps</span></p>
</div><br clear="all">
<div><img src="活页夹1_files/3b75391-34.jpg" alt="" style="width:35pt;height:25pt;">
<p><span class="font0">Centralized heat boilers</span></p>
</div><br clear="all">
<div><img src="活页夹1_files/3b75391-35.jpg" alt="" style="width:25pt;height:25pt;">
<p><span class="font0">District heating</span></p>
</div><br clear="all">
<div><img src="活页夹1_files/3b75391-36.png" alt="" style="width:14pt;height:17pt;">
</div><br clear="all">
<div><img src="活页夹1_files/3b75391-37.png" alt="" style="width:15pt;height:17pt;">
</div><br clear="all">
<div><img src="活页夹1_files/3b75391-38.png" alt="" style="width:14pt;height:17pt;">
</div><br clear="all">
<div><img src="活页夹1_files/3b75391-39.png" alt="" style="width:14pt;height:19pt;">
</div><br clear="all">
<div>
<p><span class="font1" style="font-weight:bold;">Heat network</span></p><img src="活页夹1_files/3b75391-40.jpg" alt="" style="width:21pt;height:21pt;">
</div><br clear="all">
<div>
<p><span class="font2">Heat supply</span></p>
</div><br clear="all">
<p><span class="font2">Heat demand</span></p>
<ul style="list-style:none;"><li>
<p><span class="font14" style="font-weight:bold;">Figure 7. </span><span class="font15">Power-to-heat conversion.</span></p></li></ul>
<p><span class="font16">Several authors have already analyzed these technologies combined with the wind resource. Different flexibility options for wind power plants are analyzed in [154], concluding that the P2H solutions provide the most cost-effective scenarios with the lowest CO</span><span class="font36">2 </span><span class="font16">emissions. Pursiheimo et al. focused on the feasibility of the P2G technology in Nordic countries to achieve a 100% RES system. The main applications of P2G are focused on supplying gas to transport and industrial sectors [155]. Furthermore, the use of P2G has been proved in Denmark to be a successful tool to complement wind power plants [156]. However, both investment costs of facilities and energy losses (due to the low efficiency in the conversion process) are high. Hence, the hydrogen produced from wind power also has a high cost [157]. For instance, in [158] different energy applications of hydrogen (P2P, P2G, P2M) are considered for a hybrid offshore wind-hydrogen power plant in France, obtaining negative profits due to the high investment costs in both wind and hydrogen infrastructures. Other authors conclude that the combination of a wind-hydrogen power plant should be considered to sell hydrogen directly, as re-powering hydrogen for electricity is extremely expensive [159]. Consequently, future works should be focused on reducing investment and maintenance costs for such power conversion solutions.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font16" style="font-style:italic;">3.2. North Sea Wind Power Hub</span><span class="font42" style="font-style:italic;">:</span><span class="font16" style="font-style:italic;"> The Hub-and-Spoke Project</span></p></li></ul>
<p><span class="font16">To meet the Paris Agreement and the GHG reduction goals (refer to Section</span><a href="#bookmark6"><span class="font16"> 1)</span></a><span class="font16"> in the countries around the North Sea, the North Sea Wind Power Hub (NSWPH) consortium was created. TenneT (a Dutch-German electricity TSO), Port of Rotterdam (the biggest port in Europe), Energinet (a Danish TSO) and Gasunie (a European energy infrastructure company) are the partners of the consortium [160]. NSWPH aims to facilitate the deployment of large scale OWPPs in the North Sea, evaluating and developing the Hub-and-Spoke project. The project consists on several central platforms, called hubs, which are in charge of supporting the power transport infrastructure by using the P2X conversion instead of the offshore converter platforms used currently. According to TenneT, the offshore wind power capacities will be in the range of 70 to 150 GW by the year 2040 and up to 180 GW by 2045 [161], similar values to those proposed in the TYNDP. Two main challenges are identified in NSWPH, (</span><span class="font16" style="font-style:italic;">i</span><span class="font16">) a strong power transmission infrastructure and (</span><span class="font16" style="font-style:italic;">ii</span><span class="font16">) high flexibility requirements. Mainly due to onshore surface constraints, onshore wind power plants and PV installations are not enough to decarbonize the power systems of this area [162]. The hub-and-spoke concept proposed by NSWPH is made up of several modular hubs located in different zones of the North Sea, which connect OWPPs with bordering North Sea countries. This can be seen in the figure of page 6 of [163]. By using high capacity DC cables, the power generated by OWPPs is transmitted to onshore grids in different locations connected in a smart and coordinated manner. These DC connections also provide high interconnection capacity among the different countries. Moreover, the hub-and-spoke concept can promote onshore OWPP integration through P2G transformation. Power systems thus become flexible through such P2X conversion [163].</span></p>
<p><span class="font16">Apart from defining the hub-and-spoke project, the NSWPH consortium also aims to demonstrate the technical feasibility of the project. So far, the consortium have concluded that [164]:</span></p>
<ul style="list-style:none;"><li>
<p><span class="font4">•</span><span class="font16"> The optimal capacity of the OWPP is estimated to be between 10 and 15 GW.</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> Hub substructures can be based on four different foundation types: Ciasson island, sand island, platform and gravity-based structure. A comparison among them is presented in Table</span><a href="#bookmark40"><span class="font16"> 3,</span></a><span class="font16"> as presented in [164].</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> Both the spatial requirements and investment costs of the hubs are similar regardless of being all-electric, all-hydrogen or combining electricity and hydrogen:</span></p></li>
<li>
<p><span class="font16" style="font-weight:bold;">-</span><span class="font16"> All-electric hub-and-spoke: The electricity generated by the OWPP is transmitted to the shore.</span></p></li>
<li>
<p><span class="font16" style="font-weight:bold;">-</span><span class="font16"> All-hydrogen hub-and-spoke: The electricity generated by the OWPP is transformed offshore into hydrogen, and transported through pipelines to the shore.</span></p></li>
<li>
<p><a name="bookmark40"></a><span class="font16" style="font-weight:bold;">-</span><span class="font16"> Combined electricity and hydrogen hub-and-spoke: combines the two previous concepts.</span></p></li></ul>
<p><span class="font14" style="font-weight:bold;">Table 3. </span><span class="font15">Hub substructures under consideration.</span></p>
<table border="1">
<tr><td style="vertical-align:top;"></td><td style="vertical-align:middle;">
<p><span class="font14" style="font-weight:bold;">Caisson Island</span></p></td><td style="vertical-align:middle;">
<p><span class="font14" style="font-weight:bold;">Sand Island</span></p></td><td style="vertical-align:middle;">
<p><span class="font14" style="font-weight:bold;">Platform</span></p></td><td style="vertical-align:middle;">
<p><span class="font14" style="font-weight:bold;">Gravity Based Structure</span></p></td></tr>
<tr><td style="vertical-align:bottom;">
<p><span class="font15">Water depth limit (m)</span></p></td><td style="vertical-align:bottom;">
<p><span class="font15"><25</span></p></td><td style="vertical-align:bottom;">
<p><span class="font15"><40</span></p></td><td style="vertical-align:bottom;">
<p><span class="font15"><45</span></p></td><td style="vertical-align:bottom;">
<p><span class="font15">>100</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font15">Construction time (years)</span></p></td><td style="vertical-align:top;">
<p><span class="font15">3-4</span></p></td><td style="vertical-align:top;">
<p><span class="font15">6-8</span></p></td><td style="vertical-align:top;">
<p><span class="font15">3-4</span></p></td><td style="vertical-align:top;">
<p><span class="font15">3-4</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font15">Size limit (GW)</span></p></td><td style="vertical-align:top;">
<p><span class="font15">6</span></p></td><td style="vertical-align:top;">
<p><span class="font15">>36</span></p></td><td style="vertical-align:top;">
<p><span class="font15">2</span></p></td><td style="vertical-align:top;">
<p><span class="font15"><6 (each WTs)</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font15">Maturity</span></p></td><td style="vertical-align:top;">
<p><span class="font15">Middle</span></p></td><td style="vertical-align:top;">
<p><span class="font15">Middle</span></p></td><td style="vertical-align:top;">
<p><span class="font15">High</span></p></td><td style="vertical-align:top;">
<p><span class="font15">Units - High/Linking - Middle</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font15">Footprint on seabed</span></p></td><td style="vertical-align:top;">
<p><span class="font15">High</span></p></td><td style="vertical-align:top;">
<p><span class="font15">High</span></p></td><td style="vertical-align:top;">
<p><span class="font15">Low</span></p></td><td style="vertical-align:top;">
<p><span class="font15">Middle</span></p></td></tr>
</table>
<p><span class="font16">Moreover, the lifetime savings between CAPEX (capital expenditure) and OPEX (operational expenditures) for a 12 GW hub-and-spoke project (Denmark (2 GW), Germany (6 GW) and the Netherlands (4 GW)) could rise up to 2.5 billion e, without considering the P2X conversion, compared to a radial approach. This reduction is due to the lack of additional interconnection capacity between those countries. A study compared the LCOE between hub-and-spoke projects and radial approaches, concluding that the LCOE was able to be reduced for hub sizes between 6 and 12 GW, but limited for capacity hubs between 24 and 36 GW. Furthermore, electricity prices and emissions were also reduced. The total cost saving of a hub-and-spoke project compared to a no-hub project was then estimated to be between 15 and 20 billion e [165]. The main drawback of the hub-and-spoke project is that it would take more than 10 years of development and construction to become operational. Moreover, policies, regulatory framework and market design should be reconsidered to ensure a stable market. As the Paris Agreement must be fulfilled by 2050, these issues should be urgently reconsidered in order to carry out multiple hub-and-spoke projects by then [166].</span></p>
<ul style="list-style:none;"><li>
<p><span class="font16" style="font-style:italic;">3.3. Offshore Storage Options</span><span class="font42" style="font-style:italic;">:</span><span class="font16" style="font-style:italic;"> Hydrogen and Compressed-Air Energy Storage</span></p></li></ul>
<p><span class="font16">As electrical generation has to be immediately sold to supply the electrical consumption, and due to the stochastic nature of RES, energy storage emerges as an important solution for these sources [167]. However, as traditional energy storage technologies are difficult to use in a marine environment, new alternatives are being developed to store offshore energy. Wang et al. provide a comprehensive review on existing marine renewable energy storage solutions [168].</span></p>
<ul style="list-style:none;"><li>
<p><span class="font16">3.3.1. Hydrogen Energy Storage</span></p></li></ul>
<p><span class="font16">The surplus of electricity produced by OWPP can be stored as hydrogen, and used later to generate power in fuel cells or as fuel in hydrogen vehicles [169]. Most alternatives available are based on the P2X technology, as previously described in Section</span><a href="#bookmark38"><span class="font16"> 3.1.</span></a></p>
<p><span class="font16">An example of such alternatives can be found in the Deep Purple project which is based on the important CO</span><span class="font36">2 </span><span class="font16">emissions from Norwegian oil and gas production. The project involves TechnipFMC, SINTEF, Subsea Valley and Maritim Forening Sogn og Fjordane, which develop the concept and new technology. It has received funding from the Research Council of Norway [170]. The Deep Purple project aims to convert electricity from OWPP to hydrogen and store such energy on the seabed. The hydrogen can then be used for several purposes [171,172]:</span></p>
<ul style="list-style:none;"><li>
<p><span class="font4">•</span><span class="font16"> Supply stable and renewable power to oil and gas installations</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> Supply stable and renewable power to remote islands</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> Provide a coastal hydrogen infrastructure to maritime sector</span></p></li>
<li>
<p><span class="font4">•</span><span class="font16"> Provide local production of power, hydrogen and oxygen to fist farming</span></p></li></ul>
<p><a name="bookmark41"></a><span class="font16">It is expected to have a full-scale pilot by 2025 in Norway [173]. Figure</span><a href="#bookmark41"><span class="font16"> 8 </span></a><span class="font16">depicts an overview of the Deep Purple project.</span></p><img src="活页夹1_files/3b75391-41.jpg" alt="" style="width:376pt;height:233pt;">
<p><span class="font14" style="font-weight:bold;">Figure 8. </span><span class="font15">Deep Purple project.</span></p>
<ul style="list-style:none;"><li>
<p><span class="font16">3.3.2. Compressed Air Energy Storage</span></p></li></ul>
<p><span class="font16">Compressed air energy storage (CAES) systems are a solution to energy storage based on the compression of air [174]. According to [175], the integration of CAES with wind and solar power generation can increase the RES share rate, as CAES is reported as less expensive than other storage systems, and to be large and powerful enough to store energy on a utility scale level [176]. Moreover, due to the high installation and capital cost of undersea transmission cables, offshore CAES can increase the cable’s capacity factor, potentially lowering the average cost of offshore wind power while increasing the reliability and economic value of delivered power [177].</span></p>
<p><a name="bookmark42"></a><span class="font16">The TAKEOFF Business Incubator (University of Malta) has already patented the a storage technology called FLASC, with the aim of integrating large-scale energy storage into OWPPs. This solution is tailor-made for the offshore market, exploiting existing infrastructure and supply-chains, see Figure</span><a href="#bookmark42"><span class="font16"> 9 </span></a><span class="font16">[178]. FLASC uses compressed air for energy storage purposes, relying on the hydrostatic pressure of the deep-sea areas to maintain a stable pressure in the compressed air storage. As it uses existing infrastructure, it is considered a cost-effective solution. In [179,180], the multi-system integration and the working principle of the FLASC storage technology are described. This solution can also be used in order to: (</span><span class="font16" style="font-style:italic;">i</span><span class="font16">) Convert the intermittent RES supply into a stepped out one, simplifying their grid integration by allowing the TSO to schedule operations at specific time intervals, see Figure</span><a href="#bookmark43"><span class="font16"> 10a</span></a><span class="font16">; (</span><span class="font16" style="font-style:italic;">ii</span><span class="font16">) control the ramp rate of the generated power in case of sudden natural condition changes, see Figure</span><a href="#bookmark43"><span class="font16"> 10b</span></a><span class="font16">.</span></p>
<div><img src="活页夹1_files/3b75391-42.jpg" alt="" style="width:133pt;height:146pt;">
<p><span class="font1" style="font-weight:bold;">Standard spar floater</span></p>
</div><br clear="all">
<div><img src="活页夹1_files/3b75391-43.jpg" alt="" style="width:148pt;height:78pt;">
<p><a name="bookmark43"></a><span class="font14" style="font-weight:bold;">Figure 9. </span><span class="font15">FLASC storage for offshore wind power plants (OWPPs).</span></p>
</div><br clear="all">
<div><img src="活页夹1_files/3b75391-44.jpg" alt="" style="width:190pt;height:97pt;">
<p><span class="font14" style="font-weight:bold;">Figure 10. </span><span class="font15">Further applications of FLASC storage technology. (</span><span class="font14" style="font-weight:bold;">a</span><span class="font15">) Stepped out power control. (</span><span class="font14" style="font-weight:bold;">b</span><span class="font15">) Ramp rate control.</span></p>
</div><br clear="all">
<div><img src="活页夹1_files/3b75391-45.jpg" alt="" style="width:190pt;height:97pt;">
<p><span class="font16">(</span><span class="font16" style="font-weight:bold;">b</span><span class="font16">)</span></p>
</div><br clear="all">
<p><span class="font16">A small-scale prototype was installed in Malta’s Grand Harbor in May 2018. After one year, the testing campaign was completed. Results confirmed a consistently high thermal efficiency across a variety of meteorological conditions and operating regimes after hundreds of charging cycles. The prototype was removed and decommissioned, and nowadays the FLASC team is focused on developing a large-scale demonstrator in the open sea [181,182].</span></p>
<ul style="list-style:none;"><li>
<p><a name="bookmark30"></a><span class="font16" style="font-weight:bold;">4. Conclusions</span></p></li></ul>
<p><span class="font16">Future power scenarios include offshore wind energy as an important generation source. According to this framework, this paper discusses and reviews some aspects of offshore wind power plants for a massive integration into power systems. In the last decade, several characteristics such as offshore wind turbines, wind power plants, water depth and distance to shore have increased 230%, 700%, 170% and 110%, respectively. In the same way, electrical transmission has also evolved from HVAC to HVDC solutions. Moreover, HVDC technology currently offers three different possibilities: LCCs (based on thyristors), VSCs (based on IGBTs) and DRU (based on diodes). LCCs and VSCs have already been used, whereas DRU has not been implemented yet. The advantages and drawbacks of each technology have been extensively discussed in the paper. Different future advancements currently under development are also described: P2X conversion, the hub-and-spoke project as well as hydrogen and compressed air energy storage. The P2X conversion can enhance the power system’s flexibility by converting the electricity surplus to other substances; however, its investment and maintenance costs should first be reduced to be economically viable. The hub-and-spoke project aims to facilitate the huge integration of offshore wind power plants in the North Sea; the total cost saving of this project, compared to a common offshore wind power plant, is estimated to be between 15 and 20 billion €. However, it is expected to take more than 10 years to become operational. Both hydrogen and compressed air energy storage systems appear as an alternative to conventional storage technologies due to the difficulty of using these traditional storage systems in the marine environment.</span></p>
<p><span class="font14" style="font-weight:bold;">Author Contributions: </span><span class="font15">Data curation, A.F.-G.; methodology and formal analysis, K.D. and N.A.C.; Resources A.F.-G.; Supervision, A.M.-G.; Writing-original draft A.F.-G. and A.M.-G.; and Writing-review and editing, K.D. and N.A.C.</span></p>
<p><span class="font14" style="font-weight:bold;">Funding: </span><span class="font15">This research received no external funding.</span></p>
<p><span class="font14" style="font-weight:bold;">Acknowledgments: </span><span class="font15">This work was supported by ‘Ministerio de Educacion, Cultura y Deporte/ of Spain (grant numbers FPU16/04282 and EST18/00738).</span></p>
<p><span class="font14" style="font-weight:bold;">Conflicts of Interest: </span><span class="font15">The authors declare no conflict of interest.</span></p>
<p><span class="font16" style="font-weight:bold;">Abbreviations</span></p>
<p><span class="font15">The following abbreviations are used in this manuscript:</span></p>
<table border="1">
<tr><td style="vertical-align:top;">
<p><span class="font15">AC</span></p></td><td style="vertical-align:top;">
<p><span class="font15">Alternating current</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font15">CAES</span></p></td><td style="vertical-align:top;">
<p><span class="font15">Compressed air energy storage</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font15">DC</span></p></td><td style="vertical-align:top;">
<p><span class="font15">Direct current</span></p></td></tr>
<tr><td style="vertical-align:bottom;">
<p><span class="font15">DFIG</span></p></td><td style="vertical-align:bottom;">
<p><span class="font15">Doubly fed induction generator</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font15">DRU</span></p></td><td style="vertical-align:top;">
<p><span class="font15">Diode rectifier unit</span></p></td></tr>
<tr><td style="vertical-align:bottom;">
<p><span class="font15">FSWTs</span></p></td><td style="vertical-align:bottom;">
<p><span class="font15">Fixed speed wind turbines</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font15">GHG</span></p></td><td style="vertical-align:top;">
<p><span class="font15">Greenhouse gasses</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font15">HVAC</span></p></td><td style="vertical-align:top;">
<p><span class="font15">High voltage alternating current</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font15">HVDC</span></p></td><td style="vertical-align:top;">
<p><span class="font15">High voltage direct current</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font15">IGBT</span></p></td><td style="vertical-align:top;">
<p><span class="font15">Insulated gate bipolar transistors</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font15">LCCs</span></p></td><td style="vertical-align:top;">
<p><span class="font15">Line-commutated converters</span></p></td></tr>
<tr><td style="vertical-align:bottom;">
<p><span class="font15">LCOE</span></p></td><td style="vertical-align:bottom;">
<p><span class="font15">Levelized cost of energy</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font15">OWPP</span></p></td><td style="vertical-align:top;">
<p><span class="font15">Offshore wind power plant</span></p></td></tr>
<tr><td style="vertical-align:top;">
<p><span class="font15">P2X</span></p></td><td style="vertical-align:top;">
<p><span class="font15">Power-to-X</span></p></td></tr>
<tr><td style="vertical-align:bottom;">
<p><span class="font15">PV</span></p></td><td style="vertical-align:bottom;">
<p><span class="font15">Photovoltaic</span></p></td></tr>
</table>
<p><span class="font15">RES Renewable energy sources</span></p>
<p><span class="font15">STATCOM Static synchronous compensator</span></p>
<p><span class="font15">SVC Static VAR compensator</span></p>
<p><span class="font15">TSO Transmission system pperator</span></p>
<p><span class="font15">TYNDP Ten Year Network Development Plan</span></p>
<p><span class="font15">VSCs Voltage-source converters</span></p>
<p><span class="font15">VSWTs Variable speed wind turbines</span></p>
<p><span class="font15">WPP Wind power plants</span></p>
<p><span class="font15">WTs Wind turbines</span></p>
<p><a name="bookmark9"></a><span class="font16" style="font-weight:bold;">References</span></p>
<ul style="list-style:none;"><li>
<p><span class="font15">1. Wang, W.; Huang, X.; Tan, L.; Guo, J.; Liu, H. Optimization design of an inductive energy harvesting device for wireless power supply system overhead high-voltage power lines. </span><span class="font15" style="font-style:italic;">Energies</span><span class="font14" style="font-weight:bold;"> 2016</span><span class="font15">, </span><span class="font15" style="font-style:italic;">9</span><span class="font15">, 242. </span><a href="http://dx.doi.org/10.3390/en9040242"><span class="font15">[CrossRef]</span></a></p></li>
<li>
<p><a name="bookmark10"></a><span class="font15">2. BP Energy Outlook. 2019 Edition. Available online:</span><a href="https://www.bp.com/content/dam/bp/business-sites/en/global/corporate/pdfs/energy-economics/energy-outlook/bp-energy-outlook-2019.pdf"><span class="font15"> https://www.bp.com/content/dam/bp/business-sites/</span></a><span class="font15"> </span><a href="https://www.bp.com/content/dam/bp/business-sites/en/global/corporate/pdfs/energy-economics/energy-outlook/bp-energy-outlook-2019.pdf"><span class="font15">en/global/corporate/pdfs/energy-economics/energy-outlook/bp-energy-outlook-2019.pdf </span></a><span class="font15">(accessed on 29 October 2019).</span></p></li>
<li>
<p><a name="bookmark11"></a><span class="font15">3. Clementon, R. The two sides of the Paris climate agreement: Dismal failure or historic breakthrough? </span><span class="font15" style="font-style:italic;">J. Environ. Dev.</span><span class="font14" style="font-weight:bold;"> 2016</span><span class="font15">, </span><span class="font15" style="font-style:italic;">25</span><span class="font15">.</span><a href="http://dx.doi.org/10.1177/1070496516631362"><span class="font15">[CrossRef]</span></a></p></li>
<li>
<p><a name="bookmark12"></a><span class="font15">4. Rogelj, J.; Den Elzen, M.; Hohne, N.; Fransen, T.; Fekete, H.; Winkler, H.; Schaeffer, R.; Sha, F.; Riahi, K.; Meinshausen, M. Paris Agreement climate proposals need a boost to keep warming well below 2 C. </span><span class="font15" style="font-style:italic;">Nature </span><span class="font14" style="font-weight:bold;">2016</span><span class="font15">, </span><span class="font15" style="font-style:italic;">534</span><span class="font15">, 631. </span><a href="http://dx.doi.org/10.1038/nature18307"><span class="font15">[CrossRef]</span></a><span class="font15"> </span><a href="http://www.ncbi.nlm.nih.gov/pubmed/27357792"><span class="font15">[PubMed]</span></a></p></li>
<li>
<p><a name="bookmark13"></a><span class="font15">5. Falkner, R. The Paris Agreement and the new logic of international climate politics. </span><span class="font15" style="font-style:italic;">Int. Aff.</span><span class="font14" style="font-weight:bold;"> 2016</span><span class="font15">, </span><span class="font15" style="font-style:italic;">92</span><span class="font15">, 1107-1125. </span><a href="http://dx.doi.org/10.1111/1468-2346.12708"><span class="font15">[CrossRef]</span></a></p></li>
<li>
<p><a name="bookmark14"></a><span class="font15">6. Woo, J.; Choi, H.; Ahn, J. Well-to-wheel analysis of greenhouse gas emissions for electric vehicles based on electricity generation mix: A global perspective. </span><span class="font15" style="font-style:italic;">Transp. Res. Part D Transp. Environ.</span><span class="font14" style="font-weight:bold;"> 2017</span><span class="font15">, </span><span class="font15" style="font-style:italic;">51</span><span class="font15">, 340-350. </span><a href="http://dx.doi.org/10.1016/j.trd.2017.01.005"><span class="font15">[CrossRef]</span></a></p></li>
<li>
<p><a name="bookmark15"></a><span class="font15">7. Crippa, M.; Oreggioni, G.; Guizzardi, D.; Muntean, M.; Schaaf, E.; Lo Vullo, E.; Solazzo, E.; Monforti-Ferrario, E; Olivier, J.G.J.; Vignati, E. </span><span class="font15" style="font-style:italic;">Fossil CO2 & GHG Emissions ofAll World Countries—2019 Report</span><span class="font15">; Publications Office of the European Union: Luxembourg, 2019.</span></p></li>
<li>
<p><a name="bookmark16"></a><span class="font15">8. Creutzig, F.; Agoston, P.; Goldschmidt, J.C.; Luderer, G.; Nemet, G.; Pietzcker, R.C. The underestimated</span></p></li></ul>
<p><span class="font15">potential of solar energy to mitigate climate change. </span><span class="font15" style="font-style:italic;">Nat. Energy</span><span class="font14" style="font-weight:bold;"> 2017</span><span class="font15">, </span><span class="font15" style="font-style:italic;">2</span><span class="font15">, 17140. </span><a href="http://dx.doi.org/10.1038/nenergy.2017.140"><span class="font15">[CrossRef]</span></a></p>
<ul style="list-style:none;"><li>
<p><a name="bookmark17"></a><span class="font15">9. Liddle, B.; Sadorsky, P. How much does increasing non-fossil fuels in electricity generation reduce carbon</span></p></li></ul>
<p><span class="font15">dioxide emissions? </span><span class="font15" style="font-style:italic;">Appl. Energy</span><span class="font14" style="font-weight:bold;"> 2017</span><span class="font15">, </span><span class="font15" style="font-style:italic;">197</span><span class="font15">, 212-221. </span><a href="http://dx.doi.org/10.1016/j.apenergy.2017.04.025"><span class="font15">[CrossRef]</span></a></p>
<ul style="list-style:none;"><li>
<p><a name="bookmark18"></a><span class="font15">10. Huber, M.; Dimkova, D.; Hamacher, T. Integration of wind and solar power in Europe: Assessment of flexibility requirements. </span><span class="font15" style="font-style:italic;">Energy</span><span class="font14" style="font-weight:bold;"> 2014</span><span class="font15">, </span><span class="font15" style="font-style:italic;">69</span><span class="font15">, 236-246, doi</span><a href="https://doi.org/https://doi.org/10.1016/j.energy.2014.02.109"><span class="font15">:10.1016/j.energy.2014.02.109.</span></a><span class="font15"> </span><a href="http://dx.doi.org/10.1016/j.energy.2014.02.109"><span class="font15">[CrossRef]</span></a></p></li>
<li>
<p><a name="bookmark19"></a><span class="font15">11. Pacesila, M.; Burcea, S.G.; Colesca, S.E. Analysis of renewable energies in European Union. </span><span class="font15" style="font-style:italic;">Renew. Sustain. Energy Rev.</span><span class="font14" style="font-weight:bold;"> 2016</span><span class="font15">, </span><span class="font15" style="font-style:italic;">56</span><span class="font15">, 156-170. </span><a href="http://dx.doi.org/10.1016/j.rser.2015.10.152"><span class="font15">[CrossRef]</span></a></p></li>
<li>
<p><a name="bookmark20"></a><span class="font15">12. Da Silva, R.C.; de Marchi Neto, I.; Seifert, S.S. Electricity supply security and the future role of renewable energy sources in Brazil. </span><span class="font15" style="font-style:italic;">Renew. Sustain. Energy Rev.</span><span class="font14" style="font-weight:bold;"> 2016</span><span class="font15">, </span><span class="font15" style="font-style:italic;">59</span><span class="font15">, 328-341. </span><a href="http://dx.doi.org/10.1016/j.rser.2016.01.001"><span class="font15">[CrossRef]</span></a></p></li>
<li>
<p><a name="bookmark21"></a><span class="font15">13. What is Energy Security? Available online:</span><a href="https://www.iea.org/topics/energysecurity/whatisenergysecurity/"><span class="font15"> https://www.iea.org/topics/energysecurity/whatisenergysecurity/</span></a><span class="font15"> (accessed on 24 September 2019).</span></p></li>
<li>
<p><a name="bookmark22"></a><span class="font15">14. Chalvatzis, K.J.; loannidis, A. Energy supply security in the EU: Benchmarking diversity and dependence of primary energy. </span><span class="font15" style="font-style:italic;">Appl. Energy</span><span class="font14" style="font-weight:bold;"> 2017</span><span class="font15">, </span><span class="font15" style="font-style:italic;">207</span><span class="font15">, 465T76. </span><a href="http://dx.doi.org/10.1016/j.apenergy.2017.07.010"><span class="font15">[CrossRef]</span></a></p></li>
<li>
<p><a name="bookmark23"></a><span class="font15">15. Leonavicius, V.; Genys, D.; Krikstolaitis, R. Public perception of energy security in Lithuania: Between material interest and energy independence. </span><span class="font15" style="font-style:italic;">J. Balt. Stud.</span><span class="font14" style="font-weight:bold;"> 2018</span><span class="font15">, </span><span class="font15" style="font-style:italic;">49</span><span class="font15">, 157-175. </span><a href="http://dx.doi.org/10.1080/01629778.2018.1446033"><span class="font15">[CrossRef]</span></a></p></li>
<li>
<p><a name="bookmark24"></a><span class="font15">16. Wang, X.; Palazoglu, A.; El-Farra, N.H. Operational optimization and demand response of hybrid renewable energy systems. </span><span class="font15" style="font-style:italic;">Appl. Energy</span><span class="font14" style="font-weight:bold;"> 2015</span><span class="font15">,</span><span class="font15" style="font-style:italic;">143</span><span class="font15">, 324-335. </span><a href="http://dx.doi.org/10.1016/j.apenergy.2015.01.004"><span class="font15">[CrossRef]</span></a></p></li>
<li>
<p><a name="bookmark25"></a><span class="font15">17. Weitemeyer, S.; Kleinhans, D.; Vogt, T.; Agert, C. Integration of Renewable Energy Sources in future power systems: The role of storage. </span><span class="font15" style="font-style:italic;">Renew. Energy</span><span class="font14" style="font-weight:bold;"> 2015</span><span class="font15">, </span><span class="font15" style="font-style:italic;">75</span><span class="font15">, 14-20. </span><a href="http://dx.doi.org/10.1016/j.renene.2014.09.028"><span class="font15">[CrossRef]</span></a></p></li>
<li>
<p><a name="bookmark26"></a><span class="font15">18. Teng, F.; Mu, Y.; Jia, H.; Wu, J.; Zeng, P.; Strbac, G. Challenges on primary frequency control and potential solution from EVs in the future GB electricity system. </span><span class="font15" style="font-style:italic;">Appl. Energy</span><span class="font14" style="font-weight:bold;"> 2017</span><span class="font15">, </span><span class="font15" style="font-style:italic;">194</span><span class="font15">, 353-362. </span><a href="http://dx.doi.org/10.1016/j.apenergy.2016.05.123"><span class="font15">[CrossRef]</span></a></p>
<div><img src="活页夹1_files/3b75391-46.jpg" alt="" style="width:60pt;height:66pt;">
</div><br clear="all"></li></ul>
<p><span class="font56">Contents lists available at</span><a href="http://www.sciencedirect.com/science/journal/13640321"><span class="font56"> ScienceDirect</span></a></p>
<p><span class="font23">Renewable and Sustainable Energy Reviews</span></p>
<p><span class="font4">journal homepage: </span><a href="http://www.elsevier.com/locate/rser"><span class="font4">www.elsevier.com/locate/rser</span></a></p>
<div><img src="活页夹1_files/3b75391-47.jpg" alt="" style="width:57pt;height:72pt;">
</div><br clear="all">
<h1><a name="bookmark44"></a><span class="font22"><a name="bookmark45"></a><a name="bookmark46"></a>Review of factors affecting China</span><span class="font35">,</span><span class="font22">s offshore wind power industry</span></h1>
<p><a name="bookmark47"></a><span class="font21">Zheng-Xia He</span><a href="#bookmark48"><span class="font21"><sup>a</sup></span></a><span class="font21">, Shi-Chun Xu</span><a href="#bookmark49"><span class="font21"><sup>b</sup></span></a><span class="font21"><sup>,</sup></span><a href="#bookmark50"><span class="font36"><sup>n</sup></span></a><span class="font21">, Wen-Xing Shen </span><a href="#bookmark51"><span class="font21"><sup>c</sup></span></a><span class="font21">, Hui Zhang</span><a href="#bookmark52"><span class="font21"><sup>d</sup></span></a><span class="font21">, Ru-Yin Long</span><a href="#bookmark49"><span class="font21"><sup>b</sup></span></a><span class="font21">, He Yang</span><a href="#bookmark49"><span class="font21"><sup>b</sup></span></a><span class="font21">, Hong Chen </span><a href="#bookmark49"><span class="font21"><sup>b</sup></span></a></p>
<p><a name="bookmark48"></a><span class="font36"><sup><a name="bookmark49"></a>a</sup> </span><span class="font53">Business </span><span class="font53" style="font-style:italic;">School, Jiangsu Normal University, Xuzhou 221116, China</span></p>
<p><a name="bookmark51"></a><span class="font36"><sup>b</sup> </span><span class="font53" style="font-style:italic;">Management School, China University of Mining and Technology, Xuzhou 221116, China</span></p>
<p><a name="bookmark52"></a><span class="font36"><sup>c</sup> </span><span class="font53" style="font-style:italic;">College of Economics and Management, Nanjing Forestry University, Najing 210037, China</span></p>
<p><span class="font36"><sup>d</sup> </span><span class="font53" style="font-style:italic;">College of Light Industry Science and Engineering, Nanjing Forestry University, Najing 210037, China</span></p>
<div><img src="活页夹1_files/3b75391-48.jpg" alt="" style="width:25pt;height:25pt;">
<p><span class="font55">CrossMark</span></p>
</div><br clear="all">
<div>
<p><span class="font53" style="font-weight:bold;">ARTICLE INFO</span></p>
</div><br clear="all">
<div>
<p><span class="font53" style="font-weight:bold;">ABSTRACT</span></p>
</div><br clear="all">
<div style="border-bottom:solid;">
<p><span class="font53" style="font-style:italic;">Article history:</span></p>
<p><span class="font36">Received 18 September 2014</span></p>
<p><span class="font36">Received in revised form</span></p>
<p><span class="font36">31 May 2015</span></p>
<p><span class="font36">Accepted 1 December 2015</span></p>
<p><span class="font36">Available online 30 December 2015</span></p>
<p><span class="font53" style="font-style:italic;">Keywords:</span></p>
<p><span class="font36">China</span></p>
<p><span class="font36">Offshore wind power</span></p>
<p><span class="font36">Internal and external factors</span></p>
<p><span class="font36">Sustainable development</span></p>
</div><br clear="all">
<p><span class="font55">China has very rich offshore wind energy resources, and good conditions for its development in eastern coastal areas. Making full use of these resources could effectively alleviate the tense situation in China's power supply, and contribute to energy-saving, emission reduction, and environmental protection targets. Chinese offshore wind power is still in the primary stage, and further development is facing both opportunities and challenges and constrained by weaknesses. The SWOT methodology has been adopted in this study to investigate internal and external factors affecting the Chinese offshore wind power industry. An extensive and critical literature review is also included, including academic papers, statistical data, policy documents, and websites, and 15 factors were identi</span><span class="font3">fi</span><span class="font55">ed. Strategies based on the SWOT analysis are proposed to promote the healthy and rapid development of the Chinese offshore wind power. The structural SWOT analysis framework provides insight for both policy makers and industry to gain a better understanding of what in</span><span class="font3">fl</span><span class="font55">uences the sustainable and healthy development of the offshore wind power industry in China, and provide a useful reference for research in related </span><span class="font3">fi</span><span class="font55">elds.</span></p>
<p><span class="font2">© </span><span class="font55">2015 Elsevier Ltd. All rights reserved.</span></p>
<p><span class="font19" style="font-weight:bold;">Contents</span></p>
<ul style="list-style:none;"><li>
<p><a href="#bookmark7"><span class="font55">1. Introduction</span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark53"><span class="font55">2. Research methodology </span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark54"><span class="font55">2.1. SWOT analysis methodology </span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark55"><span class="font55">2.2. Literature review </span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark56"><span class="font55">2.3. Data sources</span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark57"><span class="font55">2.4. Website searches </span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark58"><span class="font55">2.5. Policy study </span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark59"><span class="font55">3. SWOT analysis of Chinese offshore wind power industry </span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark60"><span class="font55">3.1. Analysis of strength factors</span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark61"><span class="font55">3.1.1. Abundant offshore wind energy resources </span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark62"><span class="font55">3.1.2. Ef</span><span class="font3">fi</span><span class="font55">cient absorption of inter-tidal wind power</span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark63"><span class="font55">3.1.3. The initial formation of Chinese offshore wind power industry chain </span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark64"><span class="font55">3.2. Analysis of weakness factors</span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark65"><span class="font55">3.2.1. High construction cost of offshore wind farms </span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark66"><span class="font55">3.2.2. Lack of core technologies for offshore wind turbine manufacturing</span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark67"><span class="font55">3.2.3. Low price competition and quality problems caused by overcapacity </span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark68"><span class="font55">3.2.4. Lack of coordination among relevant departments </span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a name="bookmark50"></a><span class="font5">* </span><span class="font36">Corresponding author. Tel.: </span><span class="font5">+ </span><span class="font36">86 13852431591.</span></p></li></ul>
<p><span class="font53" style="font-style:italic;">E-mail addresses:</span><span class="font36"> </span><a href="mailto:[email protected]"><span class="font36">[email protected] </span></a><span class="font36">(Z.-X. He), </span><a href="mailto:[email protected]"><span class="font36">[email protected] </span></a><span class="font36">(S.-C. Xu),</span><a href="mailto:[email protected]"><span class="font36"> [email protected] </span></a><span class="font36">(W.-X. Shen),</span><a href="mailto:[email protected]"><span class="font36"> [email protected] </span></a><span class="font36">(H. Zhang), </span><a href="mailto:[email protected]"><span class="font36">[email protected] </span></a><span class="font36">(R.-Y. Long), </span><a href="mailto:[email protected]"><span class="font36">[email protected] </span></a><span class="font36">(H. Yang), </span><a href="mailto:[email protected]"><span class="font36">[email protected] </span></a><span class="font36">(H. Chen).</span></p>
<p><a href="http://dx.doi.org/10.1016/j.rser.2015.12.037"><span class="font36">http://dx.doi.org/10.1016/j.rser.2015.12.037</span></a></p>
<p><span class="font36">1364-0321/</span><span class="font2">© </span><span class="font36">2015 Elsevier Ltd. All rights reserved.</span></p>
<ul style="list-style:none;"><li>
<p><a href="#bookmark69"><span class="font55">3.3. Analysis of opportunity factors</span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark70"><span class="font55">3.3.1. Demand for sustainable and renewable energy</span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark71"><span class="font55">3.3.2. National policy support</span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark72"><span class="font55">3.3.3. Impetus from business model innovation</span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark73"><span class="font55">3.3.4. Large scale development opportunities</span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark74"><span class="font55">3.4. Analysis of threat factors</span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark75"><span class="font55">3.4.1. No obvious alleviation effect of low Feed-in Tariff (FIT) on cost pressure</span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark76"><span class="font55">3.4.2. Insuf</span><span class="font3">fi</span><span class="font55">cient related policy support</span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark77"><span class="font55">3.4.3. Issues to connect to the power grid </span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark78"><span class="font55">3.4.4. No obvious investment pro</span><span class="font3">fi</span><span class="font55">t in offshore wind power projects</span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark79"><span class="font55">3.5. Comprehensive analysis</span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark80"><span class="font55">4. Development strategy for the offshore wind power industry </span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark81"><span class="font55">4.1. Strengthen independent R&D of core technologies through spiral interactive innovation </span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark82"><span class="font55">4.2. Further improve tariff policy</span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark83"><span class="font55">4.3. Further improve </span><span class="font3">fi</span><span class="font55">nancial subsidy policy </span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark84"><span class="font55">4.4. Actively transform the role orientation of local governments</span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark85"><span class="font55">4.5. Solve the issue of grid integration </span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark86"><span class="font55">4.6. Establish uni</span><span class="font3">fi</span><span class="font55">ed planning and a cross-sectoral linkage mechanism</span></a></p></li></ul>
<ul style="list-style:none;"><li>
<p><a href="#bookmark87"><span class="font55">5. Conclusion </span></a></p></li></ul>
<p><a href="#bookmark88"><span class="font55">Acknowledgments </span></a></p>
<p><a href="#bookmark89"><span class="font55">References </span></a></p>
<ul style="list-style:none;"><li>
<p><span class="font20" style="font-weight:bold;">1. Introduction</span></p></li></ul>
<p><span class="font56">Offshore wind power has become the forefront of global wind energy development, all countries regard offshore wind power as an important direction for the development of renewable energy. Under the support of national policy, offshore wind power construction in China has made the preliminary achievements, but compared to onshore wind power, presents new characteristics and problems, in management and technology, which must be urgently addressed to promote further rapid and healthy development.</span></p>
<p><span class="font56">Before discussing the problems and development strategies for Chinese offshore wind power, it is necessary to understand the global situation for offshore wind power. The Global Wind Energy Council (GWEC) stated that in 2014 global offshore wind power added further installed capacity of 1725 MW, with cumulative installed capacity of 8771 MW. European countries have a dominant position, adding 1488 MW in 2014, and cumulative capacity of 8050 MW, distributed in 74 offshore wind farms for 11 countries [1] (see</span><a href="#bookmark90"><span class="font56"> Fig. 1</span></a><span class="font56">). During 2014, England added 813 MW to reach installed capacity of 4494.3 MW (55.8% of European, 51.2% of the world</span><a href="#bookmark91"><span class="font1" style="font-weight:bold;"><sup>1</sup></span></a><span class="font56">); Denmark</span><span class="font3">'</span><span class="font56">s cumulative installed capacity reached 1270.6 MW (15.8% of European, 14.5% of the world); followed by Germany with cumulative installed capacity of 1049.2 MW (13% of European countries, and 12% of the world); then Belgium. China ranked </span><span class="font3">fi</span><span class="font56">fth, with cumulative installed capacity reaching 669.9 MW (7.6% of the world) (see</span><a href="#bookmark92"><span class="font56"> Fig. 2</span></a><span class="font56"> and </span><a href="#bookmark93"><span class="font56">Table 1</span></a><span class="font56">) [1]. While England has been adding the largest additional capacity for several years, it is likely this will be overtaken by Germany in 2015. Even so, England</span><span class="font3">'</span><span class="font56">s cumulative installed capacity exceeds the total of the rest of the world, and is unlikely to change substantially in the short term [2].</span></p>
<p><span class="font56">Chinese offshore wind power development to date incorporated three stages [3]:</span></p>
<ul style="list-style:none;"><li>
<p><span class="font42">•</span><span class="font56" style="font-style:italic;"> Introduction of the technology and pilot projects:</span><span class="font56"> The Donghai Bridge offshore wind power pilot project started construction in 2005 and was put into operation in 2008;</span></p></li>
<li>
<p><span class="font42">•</span><span class="font56"> Offshore wind power planning commenced in 2009. The exploration and development of Chinese offshore wind power is ongoing through a concession bidding process;</span></p></li>
<li>
<p><span class="font42">•</span><span class="font56"> The National Energy Administration (NEA) established the wind power technology standards committee of the energy industry in 2010 to strengthen standardization management and implement the exploration of large-scale development.</span></p></li></ul>
<p><span class="font56">The Chinese Wind Energy Association (CWEA) showed that (see </span><a href="#bookmark94"><span class="font56">Table 2</span></a><span class="font56">) in 2013 the accrual installed capacity was 39 MW, down by 69% compared with 2012, while in 2014 the accrual installed capacity of the Chinese offshore wind power was 229.3 MW, increasing by 487.9% compared with 2013. Inter-tidal offshore wind power comprised 130 MW of this (56.69%). By the end of 2014, the cumulative installed capacity of Chinese offshore wind power reached 657.88 MW<a name="footnote2"></a><sup><a href="#bookmark96">2</a></sup></span><a href="#bookmark95"><span class="font1" style="font-weight:bold;"><sup></sup></span></a><span class="font56">(see</span><a href="#bookmark97"><span class="font56"> Fig. 3</span></a><span class="font56">) [4].</span></p>
<p><span class="font56">The reduced additional capacity in 2013 was largely due to a series of restrictive factors and practical dif</span><span class="font3">fi</span><span class="font56">culties. A reasonable price scheme was not established prior to 2014, China's offshore wind power projects are far more complex than onshore projects, and coordination among different government departments, together with all the dif</span><span class="font3">fi</span><span class="font56">culties of national uni</span><span class="font3">fi</span><span class="font56">ed offshore wind power planning made project planning and procedures very tedious and laggard, seriously affecting the expected returns from the various projects.</span></p>
<p><span class="font56">However, some good news has brought hope to the industry since 2013. At the beginning of 2013, NEA held a forum for offshore wind power development, which signi</span><span class="font3">fi</span><span class="font56">cantly enhanced offshore wind power development. In August 2013, offshore wind power projects, which were stalled for 3 years, restarted, and three of the </span><span class="font3">fi</span><span class="font56">rst round of national concession projects have been approved by the National Development and Reform Commission (NDRC): 300 MW in Jiangsu Binhai (Datang New Energy), 200 MW in Jiangsu Dafeng (Longyuan Power), and 200 MW in Jiangsu Dongtai (Luneng Group) [5]. As of the beginning of 2014, 7 offshore wind power projects have entered the preparatory stage, with total installed capacity of 1560 MW, mainly distributed in Jiangsu, Shanghai, Fujian and Guangdong [6]. On June 5, 2014, NDRC of</span><span class="font3">fi</span><span class="font56">cially issued the </span><span class="font3">“</span><span class="font56">Notice about the Feed-in Tariff Policy of the Offshore Wind Power</span><span class="font3">” </span><span class="font56">[7]. As of July 2014, the offshore wind power plans of Shanghai, Jiangsu, Shandong, Hubei, Guangdong, and Liaoning have been approved; the wind power plan of Hainan has been submitted for approval; and the</span></p>
<div>
<p><a name="bookmark91"></a><span class="font36"><sup>1</sup> Calculated according to the data from GWEC.</span></p>
</div><br clear="all">
<div><img src="活页夹1_files/3b75391-49.jpg" alt="" style="width:209pt;height:90pt;">
<p><span class="font36">□ cumulative installed capacity of global offshore wind power(MW)</span></p>
<p><span class="font36">■ cumulative installed capacity of the European offshore wind power(MW)</span></p>
<p><span class="font36" style="font-weight:bold;">Fig. 1. </span><span class="font36">The cumulative installed capacity of global and European offshore wind power during 2011</span><span class="font27">-</span><span class="font36">2014.</span></p>
<p><a name="bookmark90"></a><span class="font53" style="font-style:italic;">Source</span><span class="font36" style="font-style:italic;">:</span><span class="font36"> Global Wind Energy Council (GWEC) and European Wind Energy Association (EWEA).</span></p>
</div><br clear="all">
<div><img src="活页夹1_files/3b75391-50.jpg" alt="" style="width:227pt;height:85pt;">
<p><span class="font38">□ Cumulative installed capacity of 2013(MW) □ Cumulative installed capacity of 2014(MW)</span></p>
</div><br clear="all">
<div>
<p><span class="font46">彳</span><span class="font10">4</span><span class="font46">号产喋忒公"忒*</span></p>
</div><br clear="all">
<p><span class="font36" style="font-weight:bold;">Fig. 2. </span><span class="font36">The ranking of cumulative installed capacity of global offshore wind power in 2014. </span><span class="font53" style="font-style:italic;">Source</span><span class="font36" style="font-style:italic;">:</span><span class="font36"> GWEC.</span></p>
<p><a name="bookmark92"></a><span class="font56">offshore wind power plans of Fujian and Zhejiang have been reviewed [8]. In December 2014, NEA issued the </span><span class="font3">“</span><span class="font56">Development and Construction Plan of National Offshore Wind Power (2014</span><span class="font3"></span><span class="font56">2016)</span><span class="font3">” </span><span class="font56">(see</span><a href="#bookmark98"><span class="font56"> Section 3.3.2</span></a><span class="font56">), which embodied the determination and plans of the Chinese government for developing offshore wind power vigorously [9].</span></p>
<p><span class="font56">Therefore, the accrual installed capacity of China's offshore wind power increased by 487.9% in 2014 over 2013 (see </span><a href="#bookmark94"><span class="font56">Table 2</span></a><span class="font56">). A number of policy documents have also contributed to this increased activity. The benchmark Feed-In-Tariff (FIT) for offshore wind power, issued in June 2014, provided developers with stable expectations for their return on the projects, although the benchmark price is on the low side; the Interim Measure for the Management of the Development and Construction of Offshore Wind Power, Offshore Wind Power Development and Construction Provisional Management Regulations and technical standards related to offshore wind power were issued (see</span><a href="#bookmark98"><span class="font56"> Section 3.3.2</span></a><span class="font56">), which led to the initial formation of Chinese offshore wind power standards. The issuance of these policy measures have provided additional stimulus for the sustainable, rapid and healthy development of the Chinese offshore wind power.</span></p>
<p><span class="font56">With emission reduction and low carbon economy becoming a major trend, the global offshore wind power market is expanding rapidly. Governments are providing increased support, and industry links are being formed, as well as the continual and constant progress of relevant technology. These combine to ensure offshore wind power is on the rise, and has become the inevitable trend for future wind energy utilization. With abundant offshore wind energy resources, China faces many development opportunities as well as new threats. A deep analysis of the internal and external factors affecting the sustainable development of offshore wind power industry is critical to provide targeted strategy suggestions and useful information and reference for policy makers and enterprises involved in offshore wind power.</span></p>
<ul style="list-style:none;"><li>
<h3><a name="bookmark53"></a><span class="font20" style="font-weight:bold;"><a name="bookmark99"></a>2. Research methodology</span></h3>
<ul style="list-style:none;">
<li>
<p><span class="font56" style="font-style:italic;">2.1. SWOT analysis methodology</span></p></li></ul></li></ul>
<p><span class="font56">This paper adopts the strengths, weaknesses, opportunities, and threats (SWOT) methodology to identify the internal and external factors that in</span><span class="font3">fl</span><span class="font56">uence the Chinese offshore wind power industry. This is a strategic analysis tool that combines the strengths and weaknesses of an organization, territory, or sector with the opportunities and threats in its environment. The goal is to identify optimal strategies that enhance the advantages, overcome the disadvantages, make use of the opportunities, and defuse the threats [10].</span></p>
<p><span class="font56">However, SWOT analysis has several limitations. Even if the analysis is well structured, there is still a lack of clear and objective standards for analyzing the strengths, weaknesses, opportunities, and threats. This analysis is often subjective and a consensus about the results may be dif</span><span class="font3">fi</span><span class="font56">cult to reach. Moreover, it can be dif</span><span class="font3">fi</span><span class="font56">cult to distinguish between internal and external factors, leading to confusion between strengths and opportunities or between weaknesses and threats [11].</span></p>
<p><span class="font56">Thus, adopting SWOT methodology as the main analysis tool, this paper will be informative and insightful for determining the strengths and weaknesses of the development, understanding the opportunities and threats faced, putting forward targeted development strategies, and maintaining and improving the competitiveness of the industry. However, at the same time it should be acknowledged that the division of internal and external factors remains static and fragmented to some extent and the judgement and relative impact of strengths and weaknesses, opportunities and threats is somewhat subjective.</span></p>
<p><span class="font56">SWOT methodology has been applied in similar cases. Zhao et al. [12] utilized a SWOT approach to identify 19 factors, whereas Zhao and Ren [13] also utilized SWOT methods and identi</span><span class="font3">fi</span><span class="font56">ed 11 factors affecting the Chinese offshore wind power industry, then further analyzed these factors and concluded that the golden period will come most likely around 2020. However, while both have identi</span><span class="font3">fi</span><span class="font56">ed the factors, neither proposed strategies based on their analysis.</span></p>
<div>
<p><a name="bookmark93"></a><span class="font36">The ranking of cumulative installed capacity of global offshore wind power during 2013</span><span class="font27">-</span><span class="font36">2014.</span></p>
</div><br clear="all">
<div>