Skip to content

Reservation changes for 2.0.1 #3857

Reservation changes for 2.0.1

Reservation changes for 2.0.1 #3857

Triggered via pull request November 12, 2024 14:15
Status Failure
Total duration 19m 20s
Artifacts 5

build_and_test.yaml

on: pull_request
Build, Lint and Test  /  Setup Environment
9s
Build, Lint and Test / Setup Environment
Build, Lint and Test  /  Build build-kit
42s
Build, Lint and Test / Build build-kit
Build, Lint and Test  /  Lint Repository
39s
Build, Lint and Test / Lint Repository
Build, Lint and Test  /  Build, Unit Tests and Install
8m 14s
Build, Lint and Test / Build, Unit Tests and Install
Build, Lint and Test  /  Integration Tests
9m 37s
Build, Lint and Test / Integration Tests
Build, Lint and Test  /  Create Coverage Badge
0s
Build, Lint and Test / Create Coverage Badge
Fit to window
Zoom out
Zoom in

Annotations

1 error
Build, Lint and Test / Integration Tests
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
EVerest~everest-core~D9QCFS.dockerbuild
32.4 KB
build-kit
583 MB
ctest-report
19.8 KB
dist
302 MB
wheels
15.9 MB