Skip to content

continuous-integration #2900

continuous-integration

continuous-integration #2900

Manually triggered November 8, 2024 01:31
Status Failure
Total duration 4m 35s
Artifacts

continuous-integration.yml

on: workflow_dispatch
Skip duplicate runs
5s
Skip duplicate runs
Matrix: smoke test release-* branches when it's a scheduled run
Check changed files
4s
Check changed files
Run linters
2m 58s
Run linters
Run shellcheck linter
5s
Run shellcheck linter
Verify API doc is up to date
1m 49s
Verify API doc is up to date
Verify CRD is up to date
41s
Verify CRD is up to date
Generate jobs for unit tests
4s
Generate jobs for unit tests
Renovate Linter
42s
Renovate Linter
Run govulncheck
42s
Run govulncheck
Matrix: Run unit tests
Build containers
0s
Build containers
Create OLM bundle and catalog
0s
Create OLM bundle and catalog
Run openshift-preflight test
0s
Run openshift-preflight test
Run OLM scorecard test
0s
Run OLM scorecard test
Matrix: olm-tests
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Run unit tests (1.29.x)
Process completed with exit code 2.
Run unit tests (1.28.x)
The job was canceled because "_1_29_x" failed.
Run unit tests (1.31.x)
The job was canceled because "_1_29_x" failed.
Run unit tests (1.31.x)
The operation was canceled.
Run unit tests (1.27.x)
The job was canceled because "_1_29_x" failed.
Run unit tests (1.27.x)
The operation was canceled.
Run unit tests (1.30.x)
The job was canceled because "_1_29_x" failed.
Run unit tests (1.30.x)
The operation was canceled.