continuous-integration #2900
continuous-integration.yml
on: workflow_dispatch
Skip duplicate runs
5s
Matrix: smoke test release-* branches when it's a scheduled run
Run linters
2m 58s
Run shellcheck linter
5s
Verify API doc is up to date
1m 49s
Verify CRD is up to date
41s
Matrix: Run unit tests
Run openshift-preflight test
0s
Run OLM scorecard test
0s
Matrix: olm-tests
Annotations
8 errors
Run unit tests (1.29.x)
Process completed with exit code 2.
|
Run unit tests (1.28.x)
The job was canceled because "_1_29_x" failed.
|
Run unit tests (1.31.x)
The job was canceled because "_1_29_x" failed.
|
Run unit tests (1.31.x)
The operation was canceled.
|
Run unit tests (1.27.x)
The job was canceled because "_1_29_x" failed.
|
Run unit tests (1.27.x)
The operation was canceled.
|
Run unit tests (1.30.x)
The job was canceled because "_1_29_x" failed.
|
Run unit tests (1.30.x)
The operation was canceled.
|