Skip to content

Implement a notify size for faster acquisition, enabling bulk acquisitions #98

Implement a notify size for faster acquisition, enabling bulk acquisitions

Implement a notify size for faster acquisition, enabling bulk acquisitions #98

Triggered via pull request July 18, 2023 14:38
Status Failure
Total duration 6h 0m 26s
Artifacts
Matrix: integration-tests
Fit to window
Zoom out
Zoom in

Annotations

8 errors
integration-tests (3.10)
The job running on runner GitHub Actions 11 has exceeded the maximum execution time of 360 minutes.
integration-tests (3.10)
The operation was canceled.
integration-tests (3.11)
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 360 minutes.
integration-tests (3.11)
The operation was canceled.
integration-tests (3.9)
The job running on runner GitHub Actions 13 has exceeded the maximum execution time of 360 minutes.
integration-tests (3.9)
The operation was canceled.
integration-tests (3.8)
The job running on runner GitHub Actions 12 has exceeded the maximum execution time of 360 minutes.
integration-tests (3.8)
The operation was canceled.