Fix clippy lint #1512
docker.yml
on: push
Generate Rust Docker image tag matrix
3s
Matrix: Build and push
Annotations
12 errors
Build and push (alpine)
Process completed with exit code 1.
|
Build and push (1-slim-bullseye)
Process completed with exit code 1.
|
Build and push (alpine3.19)
Process completed with exit code 1.
|
Build and push (latest)
Process completed with exit code 1.
|
Build and push (alpine3.20)
Process completed with exit code 1.
|
Build and push (bookworm)
Process completed with exit code 1.
|
Build and push (bullseye)
Process completed with exit code 1.
|
Build and push (slim-bookworm)
Process completed with exit code 1.
|
Build and push (slim-bullseye)
Process completed with exit code 1.
|
Build and push (slim)
Process completed with exit code 1.
|
Build and push (1.81.0-slim-bookworm)
The job running on runner GitHub Actions 9 has exceeded the maximum execution time of 360 minutes.
|
Build and push (1.81.0-slim-bookworm)
The operation was canceled.
|