You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Provide an object which has access to the dimensions of the HDPE pipe dimensions. There will be an option for one of the two types of pipes: SDR-11 or Schedule-40. There are nominal pipe sizes associated with each of these, the nominal size will be input; the inside and outside diameter will be returned.
Following the pipe selection and the nominal pipe size, the u-tube size will be known. The shank spacing needs to be supplied. Three shank spacing options will be provided by an A, B or C configuration from Paul's (1996) MS Thesis:
A configuration - the pipes are touching at the center of the borehole
B configuration - the pipes are evenly spaced in the borehole
C configuration - the pipes are touching the outside wall of the borehole
Provide an object which has access to the dimensions of the HDPE pipe dimensions. There will be an option for one of the two types of pipes: SDR-11 or Schedule-40. There are nominal pipe sizes associated with each of these, the nominal size will be input; the inside and outside diameter will be returned.
Following the pipe selection and the nominal pipe size, the u-tube size will be known. The shank spacing needs to be supplied. Three shank spacing options will be provided by an A, B or C configuration from Paul's (1996) MS Thesis:
Paul, N. D. (1996). The effect of grout thermal conductivity on vertical geothermal heat exchanger design and performance.
The text was updated successfully, but these errors were encountered: