Skip to content

Nimble 14: Fix broken tests in swift 6 #548

Nimble 14: Fix broken tests in swift 6

Nimble 14: Fix broken tests in swift 6 #548

Triggered via pull request October 14, 2024 05:49
Status Failure
Total duration 8m 19s
Artifacts

ci-swiftpm.yml

on: pull_request
SwiftPM, Windows
2m 24s
SwiftPM, Windows
Matrix: swiftpm_darwin_monterey
Matrix: swiftpm_darwin_ventura
Matrix: SwiftPM, Linux
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 1 warning
SwiftPM, Linux (swift:5.7)
Process completed with exit code 1.
SwiftPM, Linux (swift:5.8)
Process completed with exit code 1.
SwiftPM, Windows
Process completed with exit code 1.
SwiftPM, Darwin, Xcode 14.3.1
Process completed with exit code 1.
SwiftPM, Darwin, Xcode 14.0.1
Process completed with exit code 1.
SwiftPM, Darwin, Xcode 14.2
The job was canceled because "_14_0_1" failed.
SwiftPM, Darwin, Xcode 14.2
The operation was canceled.
SwiftPM, Darwin, Xcode 14.1
The job was canceled because "_14_0_1" failed.
SwiftPM, Darwin, Xcode 14.1
The operation was canceled.
SwiftPM, Darwin, Xcode 14.0.1
A brownout will take place on November 4, 14:00 UTC - November 5, 00:00 UTC to raise awareness of the upcoming macOS-12 environment removal. For more details, see https://github.com/actions/runner-images/issues/10721