Skip to content

running spa e2es against cx 2211.29 #5229

running spa e2es against cx 2211.29

running spa e2es against cx 2211.29 #5229

Triggered via pull request October 18, 2024 17:22
Status Failure
Total duration 26m 0s
Artifacts

ci-merge-checks.yml

on: pull_request
MC - Prevent retries
1s
MC - Prevent retries
MC - Confirm e2es should run
28s
MC - Confirm e2es should run
Matrix: MC - E2E B2B core
Matrix: MC - E2E B2C core
MC - E2E SSR core (B2C)
12m 54s
MC - E2E SSR core (B2C)
MC - Result
5s
MC - Result
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 1 warning
MC - E2E B2C core (5)
Process completed with exit code 2.
MC - E2E B2C core (3)
The job was canceled because "_5" failed.
MC - E2E B2C core (1)
The job was canceled because "_5" failed.
MC - E2E B2C core (1)
Process completed with exit code 5.
MC - E2E B2C core (4)
The job was canceled because "_5" failed.
MC - E2E B2C core (4)
Process completed with exit code 2.
MC - E2E B2C core (2)
The job was canceled because "_5" failed.
MC - E2E B2C core (2)
The operation was canceled.
MC - Result
Please push a commit to re-trigger the build. To push an empty commit you can use `git commit --allow-empty -m "Trigger Build"`
MC - Confirm e2es should run
The `set-output` command is deprecated and will be disabled soon. Please upgrade to using Environment Files. For more information see: https://github.blog/changelog/2022-10-11-github-actions-deprecating-save-state-and-set-output-commands/