Skip to content

pre-commit

pre-commit #3221

Triggered via push September 20, 2024 16:01
Status Failure
Total duration 55m 55s
Artifacts

build.yml

on: push
pre-commit
18s
pre-commit
ghcr-build-and-push-on-develop
0s
ghcr-build-and-push-on-develop
Matrix: test
ghcr-build-and-push-on-release
0s
ghcr-build-and-push-on-release
Matrix: check-deploy
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 1 warning
test (windows-2022, 3.9)
Process completed with exit code 1.
test (ubuntu-20.04, 3.9)
The job was canceled because "windows-2022_3_9" failed.
test (ubuntu-20.04, 3.9)
The operation was canceled.
test (macos-12, 3.11)
Failed to restore: "/usr/local/bin/gtar" failed with error: The process '/usr/local/bin/gtar' failed with exit code 2