Skip to content

Fix: Fixed some PR issues. #25

Fix: Fixed some PR issues.

Fix: Fixed some PR issues. #25

Triggered via push September 13, 2023 22:11
Status Failure
Total duration 41s
Artifacts

unit-tests.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (3.11)
Process completed with exit code 1.
build (3.10)
The job was canceled because "_3_11" failed.
build (3.10)
Process completed with exit code 1.
build (3.9)
The job was canceled because "_3_11" failed.
build (3.9)
Process completed with exit code 1.
build (3.8)
The job was canceled because "_3_11" failed.
build (3.8)
The operation was canceled.