fix: the unmatching template issue introduced from #20237 #34087
ci-build.yaml
on: pull_request
changes
13s
Ensure Go modules synchronicity
23s
Lint Go code
3m 38s
Check changes to generated code
4m 7s
Matrix: Run end-to-end tests
Run unit tests with -race for Go packages
6m 41s
E2E Tests - Composite result
0s
Process & analyze test artifacts
0s
Annotations
12 errors
Check changes to generated code
Process completed with exit code 1.
|
Run unit tests with -race for Go packages
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/20410/merge' exists
|
Run unit tests with -race for Go packages
The operation was canceled.
|
Run end-to-end tests (v1.28.13, false)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/20410/merge' exists
|
Run end-to-end tests (v1.28.13, false)
The operation was canceled.
|
Run end-to-end tests (v1.29.8, false)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/20410/merge' exists
|
Run end-to-end tests (v1.29.8, false)
The operation was canceled.
|
Run end-to-end tests (v1.30.4, false)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/20410/merge' exists
|
Run end-to-end tests (v1.30.4, false)
The operation was canceled.
|
Run end-to-end tests (v1.31.0, true)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/20410/merge' exists
|
Run end-to-end tests (v1.31.0, true)
The operation was canceled.
|
E2E Tests - Composite result
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
test-results
|
1.25 MB |
|