feat(irc): Initial charm #1
integration_test.yaml
on: pull_request
integration-tests
/
Plan
5s
Matrix: integration-tests / build
Matrix: integration-tests / Integration tests / Integration tests
integration-tests
/
Required Integration Test Status Checks
0s
Matrix: integration-tests / scan
Annotations
3 errors
integration-tests / Integration tests / Integration tests
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
integration-tests / Integration tests / Integration tests
The operation was canceled.
|
integration-tests / Required Integration Test Status Checks
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
2024-06-17T08-36-46-8b53__build__output__charm__irc-bridge
Expired
|
9.71 MB |
|
2024-06-17T08-36-46-8b53__plan
Expired
|
297 Bytes |
|