Skip to content

Lock file maintenance Python dependencies #1230

Lock file maintenance Python dependencies

Lock file maintenance Python dependencies #1230

Triggered via pull request October 14, 2024 01:54
Status Failure
Total duration 4m 50s
Artifacts 2

ci.yaml

on: pull_request
Matrix: Build charm
Check libraries
28s
Check libraries
Integration test charm  /  collect-integration-tests
Integration test charm / collect-integration-tests
Matrix: Integration test charm / integration-test
Waiting for pending jobs
Integration test charm  /  (beta) Publish Allure report
Integration test charm / (beta) Publish Allure report
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Lint
Process completed with exit code 1.
Unit test charm
Process completed with exit code 1.
Check libraries
Charmcraft libraries are not up to date.
Build charm (.) / Build charm | base #0
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
logs-charmcraft-build-packed-charm-cache-true-.-base-0
11.6 KB
packed-charm-cache-true-tests-integration-application-charm-base-0
6.18 MB