feat: optimize scheduling condition semantics #11766
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
ci.yml
on: pull_request
Annotations
5 errors and 2 warnings
e2e test (v1.26.0)
Process completed with exit code 1.
|
e2e test (v1.24.2)
The job was canceled because "v1_26_0" failed.
|
e2e test (v1.24.2)
The operation was canceled.
|
e2e test (v1.25.0)
The job was canceled because "v1_26_0" failed.
|
e2e test (v1.25.0)
The operation was canceled.
|
e2e test (v1.24.2)
No files were found with the provided path: /home/runner/work/karmada/karmada/karmada-e2e-logs/v1.24.2/. No artifacts will be uploaded.
|
e2e test (v1.25.0)
No files were found with the provided path: /home/runner/work/karmada/karmada/karmada-e2e-logs/v1.25.0/. No artifacts will be uploaded.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
karmada_e2e_log_v1.26.0
Expired
|
27.7 MB |
|
karmada_kind_log_v1.24.2
Expired
|
2.74 KB |
|
karmada_kind_log_v1.25.0
Expired
|
2.74 KB |
|
karmada_kind_log_v1.26.0
Expired
|
2.87 KB |
|