Nightly -- Full Network Tests #70
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
nightly.yml
on: schedule
Matrix: Network churning tests
Matrix: E2E tests
Matrix: Full Unit Tests (including proptests)
Matrix: dbc spend tests against network
Annotations
5 errors
Network churning tests (ubuntu-latest)
Process completed with exit code 2.
|
Network churning tests (windows-latest)
Process completed with exit code 1.
|
Network churning tests (windows-latest)
The operation was canceled.
|
Network churning tests (macos-latest)
The job was canceled because "ubuntu-latest" failed.
|
Network churning tests (macos-latest)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
safe_test_logs_churn_macos-latest
Expired
|
22.9 MB |
|
safe_test_logs_churn_ubuntu-latest
Expired
|
27.3 MB |
|
safe_test_logs_e2e_macos-latest
Expired
|
771 KB |
|
safe_test_logs_e2e_ubuntu-latest
Expired
|
879 KB |
|
safe_test_logs_e2e_windows-latest
Expired
|
683 KB |
|
safe_test_logs_spend_macos-latest
Expired
|
2.42 MB |
|
safe_test_logs_spend_ubuntu-latest
Expired
|
2.69 MB |
|
safe_test_logs_spend_windows-latest
Expired
|
3.05 MB |
|