Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

SDP MSPI driver #18893

Draft
wants to merge 1 commit into
base: main
Choose a base branch
from
Draft

Conversation

jaz1-nordic
Copy link
Contributor

SDP MSPI driver

ICMSG version

Signed-off-by: Jakub Zymelka <[email protected]>
@jaz1-nordic jaz1-nordic requested a review from a team November 14, 2024 12:13
@github-actions github-actions bot added manifest changelog-entry-required Update changelog before merge. Remove label if entry is not needed or already added. labels Nov 14, 2024
@NordicBuilder
Copy link
Contributor

The following west manifest projects have been modified in this Pull Request:

Name Old Revision New Revision Diff
zephyr nrfconnect/sdk-zephyr@dab9c11 (main) nrfconnect/sdk-zephyr#2260 nrfconnect/sdk-zephyr#2260/files

Note: This message is automatically posted and updated by the Manifest GitHub Action.

@NordicBuilder
Copy link
Contributor

CI Information

To view the history of this post, clich the 'edited' button above
Build number: 1

Inputs:

Sources:

more details

Github labels

Enabled Name Description
ci-disabled Disable the ci execution
ci-all-test Run all of ci, no test spec filtering will be done
ci-force-downstream Force execution of downstream even if twister fails
ci-run-twister Force run twister
ci-run-zephyr-twister Force run zephyr twister
List of changed files detected by CI (0)

Outputs:

Toolchain

Version:
Build docker image:

Test Spec & Results: ✅ Success; ❌ Failure; 🟠 Queued; 🟡 Progress; ◻️ Skipped; ⚠️ Quarantine

  • ❌ Toolchain
  • ❌ Build twister
  • ❌ Integration tests

Note: This message is automatically posted and updated by the CI

@NordicBuilder
Copy link
Contributor

You can find the documentation preview for this PR at this link. It will be updated about 10 minutes after the documentation build succeeds.

Note: This comment is automatically posted by the Documentation Publishing GitHub Action.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
changelog-entry-required Update changelog before merge. Remove label if entry is not needed or already added. DNM manifest manifest-zephyr
Projects
None yet
Development

Successfully merging this pull request may close these issues.

2 participants